|Table of Contents|

Calculation of urban rail transit network scale based on passenger distributing centers(PDF)

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

Issue:
2009年06期
Page:
78-81
Research Field:
Publishing date:
2009-12-20

Info

Title:
Calculation of urban rail transit network scale based on passenger distributing centers
Author(s):
CHEN Kuan-minFAN Da-keMA Chao-qun
School of Highway,Chang’an University,Xi’an 710064,Shaanxi,China
Keywords:
traffic engineering urban rail transit network scale connectivity passenger distributing center
PACS:
U239.5
DOI:
-
Abstract:
In order to control the rational scale of rail transit network, this paper analyzed the present methods to compute urban rail transit network scale and the influencing factors of urban rail transit network scale, studied the relationship between passenger distributing centers and urban rail transit network, put forward a new method to calculate urban rail transit network scale based on the connectivity between passenger distributing centers. The parameters of this model were confirmed. The network scale of Xian rail transit was computed by this method. The result showed that the rational scale of Xian urban rail transit network in main city zone is 203.13 km, which is basically accordance with the results of Xian urban rail transit network planning, this verifies that the method is feasible. 1 tab, 1 fig, 10 refs.

References:

[1]毛保华,姜帆,刘迁,等.城市轨道交通[M].北京:科学出版社,2001.
[2]陆花普,朱军,王建伟.城市轨道交通规划的研究与实践[M].北京:中国水利水电出版社,2001.
[3]安学武,杜殿虎,马超群,等.基于溢出交通需求的城市轨道交通线网规模测算模型[J].交通运输工程学报,2008,8(3):8285. AN Xuewu,DU Dianhu,MA Chaoqun,et al.Computation model of network scale for urban rail transit based on traffic demand overflow[J].Journal of Traffic and Transportation Engineering,2008,8(3):8285.
[4]孙有望,李云清,王祥.城市轨道交通网络规划的优化[J].上海交通大学学报,2000,34(增刊):5255. SUN Youwang,LI Yunqing,WANG Xiang.Planning and building of urban rail traffic network[J].Journal of Shanghai Jiaotong University,2000,34(S):5255.
[5]何宁,潘向阳.城市快速轨道交通规划的决策分析研究[J].中国公路学报,1999,12(3):7381. HE Ning,PAN Xiangyang.The decisionmaking research on urban rapid rail transit planning[J].China Journal of Highway and Transport,1999,12(3):7381.
[6]李福志,胡思继.城市快速轨道交通路网规划的相关问题[J].交通运输工程学报,2001,1(1):3942,60. LI Fuzhi.HU Siji.Some issues about traffic network planning of urban rapid mass transit[J].Journal of Traffic and Transportation Engineering,2001,1(1):3942,60.
[7]袁玉玲, 王选仓.城市轨道交通建设模式与措施[J].交通运输工程学报,2007,7(6):101106. YUAN Yuling,WANG Xuancang.Construction modes and measures of urban rail transit[J].Journal of Traffic and Transportation Engineering,2007,7(6):101106.
[8]宋杨,陈宽民,姚新虎.配合城市轨道交通的常规公交起讫点的确定[J].长安大学学报:自然科学版,2006,26(2):7376. SONG Yang,CHEN Kuanmin,YAO Xinhu.Selection of origindestination site for busrote adapting urban rail transit[J].Journal of Changan University:Natural Science Edition,2006,26(2):7376.
[9]郭其伟,朱瑜葱.城市轨道交通综合效益评价体系[J].长安大学学报:建筑与环境科学版,2003,20(3):6365. GUO Qiwei,ZHU Yucong.Comprehensive benefit evaluation system of citys rail transport[J].Journal of Changan University:Architecture and Environment Science Edition,2003,20(3):6365.
[10]沈景炎.城市轨道交通线网规划的结构形态基本线形和交点计算[J].城市轨道交通研究,2008,11(6):510. SHEN Jingyan.Basic liner structure and intersections calculation of URT network structure[J].Urban Mass Transit,2008,11(6):510.

Memo

Memo:
-
Last Update: 2009-12-20