[1] HWANG B G,SHAN M,LOOI K Y.Key constraints and mitigation strategies for prefabricated prefinished volumetric construction[J].Journal of Cleaner Production,2018,183:183-193.
[2]GB 50010—2010,混凝土结构设计规范[S].
GB 50010—2010,Gode for design of concrete structures[S].
[3]孟宪宏,张斯远,谷 立.国内预埋吊件应用现状及国内外相关规范对比分析[J].施工技术,2017,46(3):38-40.
MENG Xian-hong,ZHANG Si-yuan,GU Li.Application status of domestic embedded hanging parts and comparative analysis of relevant standard between domestic and international[J].Construction Technology,2017,46(3):38-40.
[4]吴焕娟,黄清杰,蒋勤俭,等.大型预制柱吊装技术研究[J].混凝土与水泥制品,2018(12):75-80.
WU Huan-juan,HUANG Qing-jie,JIANG Qin-jian,et al.Research on lifting technology of large precast column[J].China Concrete and Cement Products,2018(12):75-80.
[5]张亚楠,尤克泉,孔兰兰,等.新型层间抱柱式悬臂吊装施工安全性探究[J].结构工程师,2019,35(5):206-211.
ZHANG Ya-nan,YOU Ke-quan,KONG Lan-lan,et al.Study on the safety of an innovative fast construction method using on-column crane facility[J].Structural Engineers,2019,35(5):206-211.
[6]周光毅,宫立宝,王佳斌,等.装配式混凝土结构停车楼吊装施工技术[J].施工技术,2016,45(4):31-34.
ZHOU Guang-yi,GONG Li-bao,WANG Jia-bin,et al.Hoisting construction technology of the precast concrete parking building[J].Construction Technology,2016,45(4):31-34.
[7]汪中林,周 仪,肖桃李,等.装配式建筑异形PC构件吊装技术分析[J].混凝土,2019(3):140-142.
WANG Zhong-lin,ZHOU Yi,XIAO Tao-li,et al.Analysis on hoisting technology of special-shaped precast concrete component with fabricated buildings[J].Concrete,2019(3):140-142.
[8]左学兵,雷翔栋.山东海阳核电站大型结构模块吊装重心计算及配平[J].施工技术,2012,41(15):29-31.
ZUO Xue-bing,LEI Xiang-dong.Calculation of the center of gravity and design of the balance scheme for the large structural modules in Haiyang Nuclear Power Station in Shandong[J].Construction Technology,2012,41(15):29-31.
[9]于喜年,杨盈彧,王建国.某核电厂混凝土底板模块化吊装设计及应用[J].核动力工程,2013,34(6):132-135.
YU Xi-nian,YANG Ying-yu,WANG Jian-guo.Design and application of concrete floor modular hoisting in nuclear power plants[J].Nuclear Power Engineering,2013,34(6):132-135.
[10]赵国辉,谢兰敏,金玲玲.超大PC构件起吊结构分析[J].建筑结构,2016,46(增2):188-190.
ZHAO Guo-hui,XIE Lan-min,JIN Ling-ling.A hoisting method analysis of large prefabricated shear wall[J].Building Structure,2016,46(S2):188-190.
[11]冯国祥,蒋勤俭,吴焕娟.大跨度预制梁吊装应力分析及预埋吊件选用方法研究[J].混凝土,2018(10):127-131.
FENG Guo-xiang,JIANG Qin-jian,WU Huan-juan.Hoisting stress analysis of large-span precast beam and study on selection method of embedded hanger[J].Concrete,2018(10):127-131.
[12]孟宪宏,戴承良,吕雪源,等.专用预埋吊件在大型预制看台板中的应用研究[J].施工技术,2019,48(6):45-47.
MENG Xian-hong,DAI Cheng-liang,LU Xue-yuan,et al.Application research of dedicated pre-buried lifting member for prefabricated platform boards[J].Construction Technology,2019,48(6):45-47.
[13]尹锦明,姜 毅,韩光义.装配式水泥混凝土路面板块吊装应力分析[J].施工技术,2015,44(增1):393-396.
YIN Jin-ming,JIANG Yi,HAN Guang-yi.Stress analysis of fabricated cement concrete pavement slab in the process of lifting[J].Construction Technology,2015,44(S1):393-396.
[14]叶浩文,周 冲.装配式建筑的设计-加工-装配一体化技术[J].施工技术,2017,46(9):17-19.
YE Hao-wen,ZHOU Chong.Design,processing and assembly integration technology of precast buildings[J].Construction Technology,2017,46(9):17-19.
[15]郑艺杰,张 晋,尹万云,等.装配整体式剪力墙结构构件吊装分析[J].施工技术,2015,44(增1):572-576.
ZHENG Yi-jie,ZHANG Jin,YIN Wan-yun,et al.Lifting analysis of prefabricated shear wall structural components[J].Construction Technology,2015,44(S1):572-576.
[16]姚一辰,韩普各.钢筋桁架混凝土叠合板底板吊装受力性能分析[J].混凝土与水泥制品,2020(9):62-67.
YAO Yi-chen,HAN Pu-ge.Analysis of mechanical performance of reinforced concrete composite slabs with steel-bar truss[J].China Concrete and Cement Products,2020(9):62-67.
[17]SYED AMEEN,SONPAROTE RANJAN-S.Construction of pretensioned precast concrete pavement[J].Iranian Journal of Science and Technology,Transactions of Civil Engineering,2020,44(S1):507-514.
[18]ASHTIANI R S,JACKSON C J,SAEED A,et al.Precast concrete panels for conyingency rigid airfield pavement damage repairs[R].Panama City:Applied Research Associates,2010.
[19]FANG M J,ZHOU R,KE W H,et al.Precast system and assembly connection of cement concrete slabs for road pavement:A review[J].Journal of Traffic and Transportation Engineering(English Edition),2022,9(2):208-222.
[20]陈伟光,李 浩,郭志鑫,等.大尺寸预制板吊点最优布设方式的探讨[J].施工技术,2018,47(增1):1649-1652.
CHEN Wei-guang,LI Hao,GUO Zhi-xin,et al.Discussion on optimal lifting points of large-size prefabricated slab[J].Construction Technology,2018,47(S1):1649-1652.
[21]方自虎,周海俊,赖少颖,等.ABAQUS混凝土应力-应变关系选择[J].建筑结构,2013,43(增2):559-562.
FANG Zi-hu,ZHOU Hai-jun,LAI Shao-ying,et al.Choose of ABAQUS concrete stress-strain curve[J].Building Structure,2013,43(S2):559-562.
[22]曾 宇,胡良明.ABAQUS混凝土塑性损伤本构模型参数计算转换及校验[J].水电能源科学,2019,37(6):106-109.
ZENG Yu,HU Liang-ming.Calculation transformation and calibration of ABAQUS concrete plastic damage constitutive model[J].Water Resources and Power,2019,37(6):106-109.