[1] 陈建勋,姜久纯,王梦恕.黄土隧道网喷支护结构中锚杆的作用[J].中国公路学报,2007,20(3):71-75.
CHEN Jian-xun,JIANG Jiu-chun,WANG Meng-shu.Function of rock bolt of lattice girder and shotcrete support structure in loess tunnel[J].China Journal of Highway and Transport,2007,20(3):71-75.
[2]谭忠盛,喻 渝,王明年.大断面浅埋黄土隧道锚杆作用效果试验研究[J].岩土力学学报,2008,29(2):491-495.
TAN Zhong-sheng,YU Yu,WANG Ming-nian.Experimental study on bolt effect on large section shallow depth loess tunnels[J].Rock and Soil Mechanics,2008,29(2):491-495.
[3]郭 军,王明年.大跨浅埋黄土隧道中系统锚杆受力机制研究[J].岩土力学学报,2010,31(3):870-874.
GUO Jun,WANG Ming-nian.Anchoring mechanism and effect of systematic rockbolt for shallow buried loess tunnel[J].Rock and Soil Mechanics,2010,31(3):870-874.
[4]陈建勋,姜久纯,罗彦斌,等.黄土隧道洞口段支护结果的力学特性分析[J].中国公路学报,2008,21(5):75-80.
CHEN Jian-xun,JIANG Jiu-chun,LUO Yan-bin,et al.Mechanics characteristic analysis of support structure of loess tunnel entrance[J].China Journal of Highway and Transport,2008,21(5):75-80.
[5]夏永旭.高速铁路大断面黄土隧道设计与施工技术咨询报告[R].西安:长安大学,2003.
[6]谢 星,赵法锁,王东红.西安地区Q2黄土非线性流变模型[J].长安大学学报:自然科学版,2009,29(5):41-46.
XIE Xing,ZHAO Fa-suo,WANG Dong-hong.Nonlinear rheological model for Q2 loess in Xi'an region[J].Journal of Chang'an University:Natural Science Edition,2009,29(5):41-46.
[7]陕西省交通建设集团公司吴子建设管理处,长安大学.黄土隧道支护设计与关键施工技术研究[R].西安:长安大学,2010.
[8]轩俊杰.黄土隧道变形规律研究[D].西安:长安大学,2008.