[1] 胡庆安,夏永旭,王文正,等.双连拱隧道施工过程的三维数值模拟[J].长安大学学报:自然科学版,2005,25(1):48-51.
HU Qing-an,XIA Yong-xu,WANG Wen-zheng,et al.3D numerical simulation on double-arch tunnel's construction process[J].Journal of Chang'an University:Natureal Science Edition,2005,25(1):48-51.
[2]来弘鹏,谢永利,杨晓华.不同应力场软弱围岩公路连拱隧道力学特征试验[J].长安大学学报:自然科学版,2008,28(6):60-64.
LAI Hong-peng,XIE Yong-li,YANG Xiao-hua.Model tests for soft-weak surrounding rocks highway multiple-arch tunnel stress characteristics in different stress fields[J].Journal of Chang'an University:Natureal Science Edition,2008,28(6):60-64.
[3]夏永旭,裘军良,王永东.神经元网络在公路隧道支护设计中的应用[J].长安大学学报:自然科学版,2005,25(2):69-72.
XIA Yong-xu,QIU Jun-liang,WANG Yong-dong.Application of artificial neural net work in highway tunnel's support design[J].Journal of Chang'an University:Natureal Science Edition,2005,25(2):69-72.
[4]邓 刚.半荷载结构法检算浅埋(偏压)隧道结构之探讨[J].现代隧道技术,2002,39(3):29-34.
DENG Gang.Discussion on semi-load structure method for structural calculation of shallow buried tunnel[J].Modern Tunnelling Technology,2002,39(3):29-34.
[5]余 凡,杨林德.连拱隧道荷载研究[J].公路隧道,2006,53(1):5-8.
YU fan,YANG Lin-de.Study on load of multi-arch tunnel[J].Highway Tunnel,2006,53(1):5-8.
[6]丁文其,王晓形,朱合华,等.连拱隧道设计荷载的确定方法[J].中国公路学报,2007,20(5):78-82.
DING Wen-qi,WANG Xiao-xing,ZHU He-hua,et al.Defining method for designing load of multi-arch tunnel[J].China Journal of Highway and Transport,2007,20(5):78-82.
[7]夏永旭,王文正,胡庆安.公路双连拱隧道施工过程中中隔墙的变形及稳定性[J].中国公路学报,2007,20(5):83-87.
XIA Yong-xu,WANG Wen-zheng,HU Qing-an.Deformation and stability of mid-board in process of highway double-arch tunnel construction[J].China Journal of Highway and Transport,2007,20(5):83-87.
[8]李 亮,郭乃正,傅鹤林,等.破碎围岩中连拱隧道荷载计算理论解[J].中国铁道科学,2004,25(4):50-54.
LI Liang,GUO Nai-zheng,FU He-lin,et al.Theoretical load solution to chain tunnel inside broken surrounding rock[J].China Railway Science,2004,25(4):50-54.
[9]卢耀宗,杨文武.莲花山大跨度连拱隧道施工方法研究[J].中国公路学报,2001,14(2):75-77.
LU Yao-zong,YANG Wen-wu.Research on construction scheme of Lianhuashan double-arch rock tunnel[J].China Journal of Highway and Transport,2001,14(2):75-77.
[10]Lee C J,Wu B R,Chen H T.Tunnel stability and arching effects during tunneling in soft clayey soil[J].Tunnelling and Underground Space Technology,2006(21):119-132.
[11]申玉生.软弱围岩双连拱隧道设计施工关键技术研究[D].成都:西南交通大学,2005.
[12]曲海峰.扁平特大断面公路隧道荷载模式及应用研究[D].上海:同济大学,2007.
[13]朱正国.连拱隧道围岩压力计算方法与动态施工力学行为研究[D].北京:北京交通大学,2007.
[14]王华牢,李 宁,褚方平.公路隧道衬砌厚度不足对衬砌安全性影响[J].交通运输工程学报,2009,9(2):32-38.
WANG Hua-lao,LI Ning,GHU Fang-ping.Effect of lining thickness lack on lining safety for highway tunnel[J].Journal of Traffic and Transportation Engineering,2009,9(2):32-38.