[1]姜有生.土挤密桩在湿陷性黄土地基中的设计与检测[J].青海大学学报:自然科学版,2006,24(4):4851.
JIANG Yousheng.Designing and testing earth pile in collapsible loess ground[J].Journal of Qinghai University:Nature Science,2006,24(4):4851.
[2]刘三仓,隋国秀,刘志伟.非饱和饱和状态下黄土地基中灌注桩承载性能的研究[J].岩土工程学报,2007,29(1):147151.
LIU Sancang,SUI Guoxiu,LIU Zhiwei.Research on bearing capacity of castinplace piles in unsaturated to saturated loess[J].Chinese Journal of Geotechnical Engineering,2007,29(1):147151.
[3]彭小云,叶万军,折学森,等.黄土沟壑区湿软路基沉降预测模型[J].交通运输工程学报,2007,7(2):7075.
PENG Xiaoyun,YE Wanjun,SHE Xuesen,et al.Settlement prediction model of wettestsoft loess subgrade in ravine regions [J].Journal of Traffic and Transportation Engineering,2007,7(2):7075.
[4]邢玉东,王常明,张立新,等.阜新—朝阳高速公路段湿陷性黄土路基处理方法及效果[J].吉林大学学报:地球科学版,2008,38(1):98104.
XING Yudong,WANG Changming,ZHANG Lixin,et al.Subgrade treatment effects for in collapsible loess subgrade of Fuxin—Chaoyang freeway west of Liaoning Province[J].Journal of Jilin University:Earth Science Edition,2008,38(1):98104.
[5]陕西省交通运输厅世界银行贷款项目执行办公室.黄土地区公路路基设计施工技术研究[R].西安:陕西省交通运输厅,2006.
[6]沙爱民,陈开圣.压实黄土的湿陷性与微观结构的关系[J].长安大学学报:自然科学版,2006,26(4):14.
SHA Aimin,CHEN Kaisheng.Relationship between collapsibility and microstructure of compacted loess [J].Journal of Changan University:Natural Science Edition,2006,26(4):14.
[7]冯瑞玲,王园,谢永利.粗粒土振动压实特性试验[J].中国公路学报,2007,20(5):1923.
FENG Ruiling,WANG Yuan,XIE Yongli.Test on vibrated compaction properties of coarsegrained soil [J].China Journal of Highway and Transport,2007,20(5):1923.