|Table of Contents|

Subgrade loess collapsibility before and after low level tamping(PDF)

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

Issue:
2009年04期
Page:
25-29
Research Field:
Publishing date:
2009-08-20

Info

Title:
Subgrade loess collapsibility before and after low level tamping
Author(s):
YAN Bin1XU Zhang-jian2
1.School of Geology Engineering and Geomatics,Chang’an University,Xi’an 710054,Shaanxi,China;2.Northwest Research Institute of Engineering Investigation and Design,Xi’an 710054,Shaanxi,China
Keywords:
road engineering loess subgrade low level tamping collapsibility granularity analyze cement type microstructure
PACS:
U416.169
DOI:
-
Abstract:
In order to research whether the low level tamping treatment is economical and effective to collapsible loess, the physical and mechanical parameters, granularity composition, cement type and microstructure were studied with scanning soil tests, particle size analyzer and scanning electron microscopy. It is found that physical and mechanical properties, clay content increase with the increasing of power level significantly, cemented and microcemented types transform into half cemented type, the microstructure by the flocculation shape, the support pocket as well as the mosaic transform into the mosaic and the superposition structure. The results show that the effective impact depth is from 2.0 m to 2.5 m, collapsibility is basically eliminated within 2m depth. 1 tab, 8 figs, 7 refs.

References:

[1]姜有生.土挤密桩在湿陷性黄土地基中的设计与检测[J].青海大学学报:自然科学版,2006,24(4):4851. JIANG Yousheng.Designing and testing earth pile in collapsible loess ground[J].Journal of Qinghai University:Nature Science,2006,24(4):4851.
[2]刘三仓,隋国秀,刘志伟.非饱和饱和状态下黄土地基中灌注桩承载性能的研究[J].岩土工程学报,2007,29(1):147151. LIU Sancang,SUI Guoxiu,LIU Zhiwei.Research on bearing capacity of castinplace piles in unsaturated to saturated loess[J].Chinese Journal of Geotechnical Engineering,2007,29(1):147151.
[3]彭小云,叶万军,折学森,等.黄土沟壑区湿软路基沉降预测模型[J].交通运输工程学报,2007,7(2):7075. PENG Xiaoyun,YE Wanjun,SHE Xuesen,et al.Settlement prediction model of wettestsoft loess subgrade in ravine regions [J].Journal of Traffic and Transportation Engineering,2007,7(2):7075.
[4]邢玉东,王常明,张立新,等.阜新—朝阳高速公路段湿陷性黄土路基处理方法及效果[J].吉林大学学报:地球科学版,2008,38(1):98104. XING Yudong,WANG Changming,ZHANG Lixin,et al.Subgrade treatment effects for in collapsible loess subgrade of Fuxin—Chaoyang freeway west of Liaoning Province[J].Journal of Jilin University:Earth Science Edition,2008,38(1):98104.
[5]陕西省交通运输厅世界银行贷款项目执行办公室.黄土地区公路路基设计施工技术研究[R].西安:陕西省交通运输厅,2006.
[6]沙爱民,陈开圣.压实黄土的湿陷性与微观结构的关系[J].长安大学学报:自然科学版,2006,26(4):14. SHA Aimin,CHEN Kaisheng.Relationship between collapsibility and microstructure of compacted loess [J].Journal of Changan University:Natural Science Edition,2006,26(4):14.
[7]冯瑞玲,王园,谢永利.粗粒土振动压实特性试验[J].中国公路学报,2007,20(5):1923. FENG Ruiling,WANG Yuan,XIE Yongli.Test on vibrated compaction properties of coarsegrained soil [J].China Journal of Highway and Transport,2007,20(5):1923.

Memo

Memo:
-
Last Update: 2009-08-20