|Table of Contents|

BIM based structural state visualization system for highway tunnels(PDF)

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

Issue:
2024年3期
Page:
116-124
Research Field:
桥梁与隧道工程
Publishing date:

Info

Title:
BIM based structural state visualization system for highway tunnels
Author(s):
QIAN Chao1 LI Shuai1 LI Hu-xiong1 LUO Yan-bin2 CHEN Jian-xun2
(1. School of Electronic and Control Engineering, Chang'an University, Xi'an 710064, Shaanxi, China; 2. School of Highway, Chang'an University, Xi'an 710064, Shaanxi, China)
Keywords:
tunnel engineering data visualization BIM digital management structural state
PACS:
U491
DOI:
10.19721/j.cnki.1671-8879.2024.03.010
Abstract:
In the process of highway tunnel construction and operation, in order to grasp the change law of tunnel structure, the deformation of tunnel structure is usually analyzed by monitoring the settlement, deformation and force of tunnel structure, and the change trend of tunnel structure is predicted.In the above data analysis process, the collected data is usually imported offline into Excel, Origin and other software for analysis, and displays the results in charts and tables. Aiming at its many deficiencies, such as timeliness hysteresis in data analysis, inefficient utilization, great difficulty in results acquisition, etc., BIM technology was combined with tunnel monitoring and measurement information, a structural state visualization system for highway tunnels was designed and developed. The division of tunnel engineering components by the civil structure of highway tunnels and related specifications was studied, and the classification method of tunnel model components was proposed. Onthis basis, the tunnel BIM model was constructed, and the coding method of tunnel components and structural condition monitoring sensors were designed. Referring to the research on the stability determination of existing tunnels, a structural state classification method based on tunnel structural state coefficients was proposed, and a visual mapping scheme and associated BIM method for structural state data were designed. Based on the tunnel three-dimensional space model, tunnel structural information, monitoring measurement database, and the three-stage visualization process, the 3D visualization of the highway tunnel structural state was realized using the Unity 3D engine. The Browser/Server architecture was adopted to realize cloud management of monitoring measurement data and deployment of visualization systems on the cloud server. Relying on the Lianchengshan Highway Tunnel in the Baohan(Baoji-Hanzhong)Highway, the system functions such as 3D visualization and forward simulation of the structural state of the tunnel were verified. It provides technical support for improving the digital management level of highway tunnels throughout the whole life cycle.4 tabs, 13 figs, 21 refs.

References:

[1] 张俊儒,燕 波,龚彦峰,等.隧道工程智能监测及信息管理系统的研究现状与展望[J].地下空间与工程学报,2021,17(2):567-579.
ZHANG Jun-ru,YAN Bo,GONG Yan-feng,et al.Research status and prospects of intelligent monitoring technology and information management system for tunnel engineering[J].Chinese Journal of Underground Space and Engineering,2021,17(2):567-579.
[2]段培勇,卢世团.朔黄铁路基础设施长期监测平台架构设计与研究[J].铁道建筑,2020,60(12):147-150.
DUAN Pei-yong,LU Shi-tuan.Design and research of Shuohuang Railway infrastructure long term monitoring platform architecture[J].Railway Engineering,2020,60(12):147-150.
[3]孟振江,彭建兵,黄强兵,等.基于断裂错动引起地铁隧道的变形响应研究[J].工程地质学报,2017,25(6):1624-1632.
MENG Zhen-jiang,PENG Jian-bing,HUANG Qiang-bing,et al.Study on deformation response of metro tunnel based on fracture dislocation[J].Journal of Engineering Geology,2017,25(6):1624-1632.
[4]王 军,夏才初,朱合华,等.不对称连拱隧道现场监测与分析研究[J].岩石力学与工程学报,2004,23(2):267-271.
WANG Jun,XIA Cai-chu,ZHU He-hua,et al.Sitemonitoring and analysis of non-symmetrical multi-arch highway tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(2):267-271.
[5]周 钊,赵学亮,韩天然,等.盾构隧道监测数据三维可视化研究[J].地下空间与工程学报,2021,17(增2):892-901.
ZHOU Zhao,ZHAO Xue-liang,HAN Tian-ran,et al.Research on 3D visualization of monitoring data of shield tunnel[J].Chinese Journal of Underground Space and Engineering,2021,17(S2):892-901.
[6]路德春,吕 琦,杜修力,等.隧道结构与围岩土体三维地震反应分析[J].防灾减灾工程学报,2015,35(2):199-204.
LU De-chun,LU Qi,DU Xiu-li,et al.Three dimensionalseismic response analysis of tunnels and surrounding rock[J].Journal of Disaster Prevention and Mitigation Engineering,2015,35(2):199-204.
[7]张益瑄,林文凯,晏启祥,等.地形复杂三维地质模型下围岩的蠕变特性研究[J].铁道标准设计,2018,62(12):80-86.
ZHANG Yi-xuan,LIN Wen-kai,YAN Qi-xiang,et al.Analysis of creep characteristics of 3D complex terrain geological model[J].Railway Standard Design,2018,62(12):80-86.
[8]程方圆,姚国明,奎永才,等.集成GIS/BIM的公路隧道数字化管理研究及应用[J].隧道建设(中英文),2019,39(12):1973-1980.
CHENG Fang-yuan,YAO Guo-ming,KUI Yong-cai,et al.GIS/BIM-integrated digital management of highway tunnel and its applaction[J].Tunnel Construction,2019,39(12):1973-1980.
[9]CHMELINA K,RABENSTEINER K,KRUSCHE G.A tunnel information system for the management and utilization of geo-engineering data in urban tunnel projects[J].Geotechnical and Geological Engineering,2013,31(3):845-859.
[10]LIU B,SUN X B.Application analysis of BIM technology in metro rail transit[J].IOP Conference Series:Earth and Environmental Science,2018,128(1):012028.
[11]解晓明.BIM技术在山区公路工程项目全寿命周期管理中的应用[J].公路工程,2018,43(4):296-300.
XIE Xiao-ming.Application of BIM technology in the whole life cycle management of mountain highway engineering project[J].Highway Engineering,2018,43(4):296-300.
[12]李海亮.面向BIM设计的复杂工点三维场景建模方法研究[J].中外公路,2021,41(6):306-308.
LI Hai-liang.Research on 3D scene modeling method for complex worksites based on BIM design[J].Journal of China & Foreign Highway,2021,41(6):306-308.
[13]智 鹏,史天运,王万齐,等.高速铁路隧道工程精益化建设管理关键技术[J].现代隧道技术,2018,55(6):26-32.
ZHI Peng,SHI Tian-yun,WANG Wan-qi,et al.Key techniques for lean construction and management of the high-speed railway tunnels[J].Modern Tunnelling Technology,2018,55(6):26-32.
[14]智 鹏,史天运,王辉麟,等.京张高铁清华园隧道施工管理BIM关键技术[J].现代隧道技术,2018,55(4):53-58.
ZHI Peng,SHI Tian-yun,WANG Hui-lin,et al.BIM techniques for construction management of the Qinghuayuan Tunnel on the Beijing-Zhangjiakou High-speed Railway[J].Modern Tunnelling Technology,2018,55(4):53-58.
[15]PROVIDAKIS S,ROGERS C D F,CHAMPAN D N.Predictions of settlement risk induced by tunnelling using BIM and 3D visualization tools[J].Tunnelling and Underground Space Technology Incorporating Trenchless Technology Research,2019,92:103049.
[16]胡 珉,刘攀攀,喻 钢,等.基于全生命周期信息和BIM的隧道运维决策支持系统[J].隧道建设,2017,37(4):394-400.
HU Min,LIU Pan-pan,YU Gang,et al.Design suppport system for tunnel operation and maintenace based on BIM and tunnel whole life cycle information[J].Tunnel Construction,2017,37(4):394-400.
[17]高建新,姜谙男,郑 帅,等.基于BIM的参数化隧道标准建模方法[J].中外公路,2021,41(4):236-241.
GAO Jian-xin,JIANG An-nan,ZHENG Shuai,et al.Standard parametric modeling approach for tunnel based on BIM[J].Journal of China & Foreign Highway,2021,41(4):236-241.
[18]蒋雅君,李明博,陶双江,等.BIM技术在隧道衬砌病害信息可视化中的应用[J].地下空间与工程学报,2018,14(4):1114-1121.
JIANG Ya-jun,LI Ming-bo,TAO Shuang-jiang,et al.Application of BIM technology on the visualization of tunnel lining defects information[J].Chinese Journal of Underground Space and Engineering,2018,14(4):1114-1121.
[19]刘星宏,林达明,俞 缙,等.BIM技术在国内隧道工程中的应用[J].现代隧道技术,2020,57(6):25-35.
LIU Xing-hong,LIN Da-ming,YU Jin,et al.Review on BIM technology applied in tunnel engineering in China[J].Modern Tunnelling Technology,2020,57(6):25-35.
[20]梁 波.隧道工程[M].重庆:重庆大学出版社,2015.
LIANG Bo.Tunnel engineering[M].Chongqing:Chongqing University Press,2015.
[21]谢全敏,马 伟,杨文东.公路隧道结构健康监测系统设计与实施[J].中国安全科学学报,2022,32(7):56-62.
XIE Quan-min,MA Wei,YANG Wen-dong.Design and implementation of SHM system for highway tunnels[J].China Safety Science Journal,2022,32(7):56-62.

Memo

Memo:
-
Last Update: 2024-05-01