[1] 苏剑南.厦漳跨海大桥北汊主桥合理成桥状态研究[J].桥梁建设,2013,43(4):44-48.
SU Jian-nan.Study of rational completed bridge state of North Main Bridge of Xiazhang Sea-crossing Bridge[J].Bridge Construction,2013,43(4):44-48.
[2]SONG C L,XIAO R C,SUN B.Improved method for shape finding of long-span suspension bridges[J].International Journal of Steel Structures,2020,20(1):247-258.
[3]LONETTI P,PASCUZZO A.Optimum design analysis of hybrid cable-stayed suspension bridges[J].Advances in Engineering Software,2014,73:53-66.
[4]JUNG M R,MIN D J,KIM M Y.Simplified analytical method for optimized initial shape analysis of self-anchored suspension bridges and its verification[J].Mathematical Problems in Engineering,2015,2015:1-14.
[5]曹鸿猷,陈志军,吴巧云,等.基于单索理论的多塔悬索桥简化计算模型[J].中国公路学报,2016,29(4):77-84.
CAO Hong-you,CHEN Zhi-jun,WU Qiao-yun,et al.Simplified calculation model for multi-span suspension bridges based on single cable theory[J].China Journal of Highway and Transport,2016,29(4):77-84.
[6]ZHOU G P,LI A Q,LI J H,et al.Determination and implementation of reasonable completion state for the self-anchored suspension bridge with extra-wide concrete girder[J].Applied Sciences,2019,9(12):2576.
[7]李小年,张小月,马如进,等.自锚式悬索桥合理成桥状态的实用计算方法[J].公路交通科技,2013,30(6):82-87.
LI Xiao-nian,ZHANG Xiao-yue,MA Ru-jin,et al.Practical calculation method of rational completion status of self-anchored suspension bridge[J].Journal of Highway and Transportation Research and Development,2013,30(6):82-87.
[8]汤金涛,王勇华,张秋美.三塔自锚式悬索-斜拉协作体系成桥状态计算方法[J].公路,2013,58(4):6-12.
TANG Jin-tao,WANG Yong-hua,ZHANG Qiu-mei.Calculation method of three towers self-anchored suspension and cable-stayed composite structure in completion state[J].Highway,2013,58(4):6-12.
[9]戴 杰,秦凤江,狄 谨,等.斜拉桥成桥索力优化方法研究综述[J].中国公路学报,2019,32(5):17-37.
DAI Jie,QIN Feng-jiang,DI Jin,et al.Review on cable force optimization method for cable-stayed bridge in completed bridge state[J].China Journal of Highway and Transport,2019,32(5):17-37.
[10]LI J H,FENG D M,LI A Q,et al.Determination of reasonable finished state of self-anchored suspension bridges[J].Journal of Central South University,2016,23(1):209-219.
[11]WANG S R,ZHOU Z X,WEN D,et al.New method for calculating the preoffsetting value of the saddle on suspension bridges considering the influence of more parameters[J].Journal of Bridge Engineering,2016,21(12):1-9.
[12]ZHANG W M,YANG C Y,WANG Z W,et al.An analytical algorithm for reasonable central tower stiffness in the three-tower suspension bridge with unequal-length main spans[J].Engineering Structures,2019,199:109595.
[13]唐茂林.大跨度悬索桥空间几何非线性分析与软件开发[D].成都:西南交通大学,2003.
TANG Mao-lin.Spatial geometric nonlinear analysis and software development of long-span suspension bridge[D].Chengdu:Southwest Jiaotong University,2003.
[14]齐东春.大跨径悬索桥主缆精细化计算研究[D].成都:西南交通大学,2012.
QI Dong-chun.Study on fine calculation of main cable of long-span suspension bridge[D].Chengdu:Southwest Jiaotong University,2012.
[15]NIU W J,YU H T.A new analytic solution to determine internal load of small span suspension bridge[J].KSCE Journal of Civil Engineering,2016,20(4):1419-1428.
[16]LONETTI P,PASCUZZO A.Vulnerability and failure analysis of hybrid cable-stayed suspension bridges subjected to damage mechanisms[J].Engineering Failure Analysis,2014,45:470-495.
[17]万利军,单 炜,姜 华.自锚式悬索桥合理成桥状态静力特性试验研究[J].公路工程,2014,39(5):155-159.
WAN Li-jun,SHAN Wei,JIANG Hua.Study on static characteristics in reasonable finished state of self-anchored suspension bridge[J].Highway Engineering,2014,39(5):155-159.
[18]周云岗.基于迭代分析的多塔悬索桥合理成桥状态确定方法[J].郑州大学学报(工学版),2014,35(1):99-103.
ZHOU Yun-gang.Determination method of reasonable finished dead state of multi-town suspension bridges based on iterative analysis[J].Journal of Zhengzhou University(Engineering Science),2014,35(1):99-103.
[19]RSC A,ACCL B,RGLDS C,et al.Cable structures:An exact geometric analysis using catenary curve and considering the material nonlinearity and temperature effect[J].Engineering Structures,2022,253:113738.
[20]ZHANG W M,CHANG J Q,TIAN G M.FEM-based shape-finding and force-assessment of suspension bridges via completed loop adjustment[J].Journal of Bridge Engineering,2022,27(1):1-15.
[21]KIM H K,LEE M J,CHANG S P.Non-linear shape-finding analysis of a self-anchored suspension bridge[J].Engineering Structures,2002,24(12):1547-1559.
[22]张文明,常佳琦,田根民,等.不等主跨三塔空间缆索悬索桥主缆线形解析计算方法[J].桥梁建设,2022,52(1):109-115.
ZHANG Wen-ming,CHANG Jia-qi,TIAN Gen-min,et al.An analytical method for main cable shape of three-tower suspension bridge with asymmetrical two main spans and spatial cables[J].Bridge Construction,2022,52(1):109-115.
[23]CAO H Y,ZHOU Y L,CHEN Z J,et al.Form-finding analysis of suspension bridges using an explicit iterative approach[J].Structural Engineering and Mechanics,2017,62(1):85-95.
[24]HUU T T,DONG H C.Advanced analysis of multi-span suspension bridges[J].Journal of Constructional Steel Research,2013,90:29-41.
[25]邓小康,谢肖礼,徐恭义.武汉杨泗港长江大桥成桥状态的统一悬链线计算方法[J].桥梁建设,2018,48(4):79-83.
DENG Xiao-kang,XIE Xiao-li,XU Gong-yi.Unified catenary calculation method for main cable of WuhanYangsigang Changjiang River Bridge in completion state[J].Bridge Construction,2018,48(4):79-83.
[26]朱伟华,颜东煌,许红胜.三塔悬索桥中塔适宜刚度数值解析算法[J].中国公路学报,2023,36(4):112-123.
ZHU Wei-hua,YAN Dong-huang,XU Hong-sheng.Numerical analytical algorithm for suitable stiffness of middle tower of three-tower suspension bridge[J].China Journal of Highway and Transport,2023,36(4):112-123.