[1] 李 斌,高 潮,张嘉莹.港珠澳大桥沉管隧道瞬时沉降规律分析[J].岩土工程学报,2021,43(增2):263-266.
LI Bin,GAO Chao,ZHANG Jia-ying.Instantaneous settlement of immersed tube tunnel of Hong Kong-Zhuhai-Macao Bridge[J].Chinese Journal of Geotechnical Engineering,2021,43(S2):263-266.
[2]陈湘生,徐志豪,包小华,等.中国隧道建设面临的若干挑战与技术突破[J].中国公路学报,2020,33(12):1-14.
CHEN Xiang-sheng,XU Zhi-hao,BAO Xiao-hua,et al.Challenges and technological breakthroughs in tunnel construction in China[J].China Journal of Highway and Transport,2020,33(12):1-14.
[3]XUE Y G,ZHOU B H,GE S Q,et al.Optimum design calculation method for the reasonable buried depth:A case study from Hong Kong-Zhuhai-Macao Immersed Tunnel[J].Ocean Engineering,2020,206:107275.
[4]ZHOU J,TIAN Q,ZHANG X K,et al.Durability test of lining concrete for immersed subsea tunnel[J].Journal of Coastal Research,2019,97(S1):82.
[5]LIN M,LIN W,YIN H,et al.Memory bearing:A novel solution to protect element joints from differential settlement for immersed tunnels with deep alignment[J].Tunnelling and Underground Space Technology,2019,88:144-155.
[6]禹海涛,萧文浩,赵 旭,等.沉管隧道柔性接头压缩性能研究[J].中国公路学报,2019,32(5):115-122,180.
YU Hai-tao,XIAO Wen-hao,ZHAO Xu,et al.Compression performance of flexible joints in immersed tunnels[J].China Journal of Highway and Transport,2019,32(5):115-122,180.
[7]ZHAO K,WANG Q,WU Q,et al.Stability of immersed tunnel in liquefiable seabed under wave loadings[J].Tunnelling and Underground Space Technology,2020,102:103449.
[8]LI S C,WU J.A multi-factor comprehensive risk assessment method of Karst tunnels and its engineering application[J].Bulletin of Engineering Geology and the Environment,2019,78(3):1761-1776.
[9]WU X L,PAN J R,LIAO Y X,et al.Study on tunnel risk assessment based on rough set and grey theory[J].IOP Conference Series:Earth and Environmental Science,2019,330(2):022027.
[10]QIU D H,LIU Y,XUE Y G,et al.Prediction of the surrounding rock deformation grade for a high-speed railway tunnel based on rough set theory and a cloud model[J].Iranian Journal of Science and Technology,Transactions of Civil Engineering,2021,45(1):303-314.
[11]BAI C,XUE Y,QIU D,et al.Real-time updated risk assessment model for the large deformation of the soft rock tunnel[J].International Journal of Geomechanics,2020,21(1):04020234.
[12]WU Z Q,ZOU S L.A static risk assessment model for underwater shield tunnel construction[J].Sādhanā,2020,45:215.
[13]WANG Y C,ZHAO N,JING H W,et al.A novel model of the ideal point method coupled with objective and subjective weighting method for evaluation of surrounding rock stability[J].Mathematical Problems in Engineering,2016(2016):1-9.
[14]施泉生,涂娜娜.层次灰色分析法在电厂安全评价中的应用[J].上海电力学院学报,2005,21(1):81-84,89.
SHI Quan-sheng,TU Na-na.The application of hierarchy gray assessment in safety evaluation of power plant[J].Journal of Shanghai Institute & Electric Power,2005,21(1):81-84,89.
[15]TAN X,CHEN W Z,WANG L Y,et al.Integrated approach for structural stability evaluation using real-time monitoring and statistical analysis:Underwater shield tunnel case study[J].Journal of Performance of Constructed Facilities,2020,34(2):04019118.
[16]EL-GAYAR O F.A web-based multi-perspective decision support system for information security planning[J].Decision Support Systems,2010,50(1):43-54.
[17]林永亮,赵 磊.熵权和集对的耦合模型评价盾构隧道健康[J].地下空间与工程学报,2019,15(4):1239-1245.
LIN Yong-liang,ZHAO Lei.Health evaluating for shield tunnel by entropy weight and set pair coupling model[J].Chinese Journal of Underground Space and Engineering,2019,15(4):1239-1245.
[18]孙 可,张 巍,朱守兵,等.盾构隧道健康监测数据的模糊层次分析综合评价方法[J].防灾减灾工程学报,2015,35(6):769-776.
SUN Ke,ZHANG Wei,ZHU Shou-bing,et al.Fuzzy analytical hierarchy process comprehensive evaluation method for health monitoring data of shield tunnels[J].Journal of Disaster Prevention and Mitigation Engineering,2015,35(6):769-776.
[19]魏晓悦,靳春玲,贡 力,等.基于PCA-改进RBF神经网络模型的铁路隧道突水风险评价[J].铁道科学与工程学报,2021,18(3):794-802.
WEI Xiao-yue,JIN Chun-ling,GONG Li,et al.Risk evaluation of railway tunnel water inrush based on PCA-improved RBF neural network model[J].Journal of Railway Science and Engineering,2021,18(3):794-802.
[20]汪 波,何 川,吴德兴.隧道结构健康监测系统理念及其技术应用[J].铁道工程学报,2012,29(1):67-72.
WANG Bo,HE Chuan,WU De-xing.Ideas of tunnel structure health monitoring system and its technology application[J].Journal of Railway Engineering Society,2012,29(1):67-72.
[21]李 伟,张 淼,蔡 影.基于聚类分析的隧道健康评价[J].西华大学学报(自然科学版),2017,36(2):106-112.
LI Wei,ZHANG Miao,CAI Ying.Tunnel health assessment based on cluster analysis[J].Journal of Xihua University(Natural Science Edition),2017,36(2):106-112.
[22]蒋宇静,张学朋.隧道衬砌自动化检测及健康评价技术研究[J].隧道建设(中英文),2021,41(3):341-348.
JIANG Yu-jing,ZHANG Xue-peng.Research on automatic detection and health assessment of tunnel lining[J].Tunnel Construction,2021,41(3):341-348.
[23]张 敏,朱江华,肖 洪,等.沉管隧道健康状态评价中权重确定的主-客观融合方法[J].隧道建设,2016,36(9):1071-1075.
ZHANG Min,ZHU Jiang-hua,XIAO Hong,et al.Subjective-objective fusion method for weight determination of operation health diagnosing of immersed tunnel[J].Tunnel Construction,2016,36(9):1071-1075.
[24]王亚琼,周绍文,孙铁军,等.基于模糊贴近度的公路隧道结构健康评价[J].公路交通科技,2014,31(12):78-83.
WANG Ya-qiong,ZHOU Shao-wen,SUN Tie-jun,et al.Structural health assessment for highway tunnels based on fuzzy proximity[J].Journal of Highway and Transportation Research and Development,2014,31(12):78-83.
[25]叶 飞,李文辉,韩 鑫,等.基于动静结合的公路隧道洞口设计综合评价体系研究[J].中国公路学报,2021,34(6):125-135.
YE Fei,LI Wen-hui,HAN Xin,et al.Comprehensive evaluation system for a highway tunnel portal design based on the combination of dynamics and statics[J].China Journal of Highway and Transport,2021,34(6):125-135.
[26]XU X C,TONG L,LIU S,et al.Evaluation model for immersed tunnel health state:A case study of Honggu Tunnel,Jiangxi Province,China[J].Tunnelling and Underground Space Technology,2019,90:239-248.
[27]朱苦竹,刘春龙,孙洋波,等.隧道洞口健康诊断AHP模糊评判及其可视化[J].地下空间与工程学报,2016,12(3):803-809.
ZHU Ku-zhu,LIU Chun-long,SUN Yang-bo,et al.Tunnel portal health diagnosis based on AHP fuzzy evaluation method and its visualization[J].Chinese Journal of Underground Space and Engineering,2016,12(3):803-809.