[1] 《中国公路学报》编辑部.中国交通隧道工程学术研究综述·2022[J].中国公路学报,2022,35(4):1-40.
Editorial Department of China Journal of Highway and Transport.Review on China’s traffic tunnel engineering research:2022[J].China Journal of Highway and Transport,2022,35(4):1-40.
[2]王帅帅,毛锦波,张斌斌,等.乌尉高速天山胜利隧道总体施工技术方案[J].现代隧道技术,2022,59(1):55-68.
WANG Shuai-shuai,MAO Jin-bo,ZHANG Bin-bin,et al.General construction technology scheme of Tianshan Shengli Tunnel on Urumqi-Yuli Expressway[J].Modern Tunnelling Technology,2022,59(1):55-68.
[3]AKHTAR S,KUMRAL M,SASMITO A P.Correlating variability of the leakage characteristics with the hydraulic performance of an auxiliary ventilation system[J].Building and Environment,2017,121(47):200-214.
[4]SU F P,ZHOU X Q,WANG Y.Influence of atmospheric pressure fluctuation on air leakage rate of airtight-wall[J].Procedia Engineering,2011,11:401-408.
[5]ONDER M,CEVIK E.Statistical model for the volume rate reaching the end of ventilation duct[J].Tunnelling and Underground Space Technology,2008,23(2):179-184.
[6]赵宁雨,吕陈伏,陈弘杨,等.高海拔长大隧道压入式施工通风的合理长度研究[J].重庆交通大学学报(自然科学版),2020,39(3):94-99,128.
ZHAO Ning-yu,LU Chen-fu,CHEN Hong-yang,et al.Optimal length of forced ventilation in construction of long tunnel at high altitude[J].Journal of Chongqing Jiaotong University(Natural science),2020,39(3):94-99,128.
[7]TORANO J,TORNO S,MENENDEZ M,et al.Auxiliary ventilation in mining roadways driven with roadheaders:Validated CFD modelling of dust behaviour[J].Tunnelling and Underground Space Technology,2011,26(1):201-210.
[8]MARCHANT T,PORTER I.Modelling auxiliary ventilation systems for long tunnels[C]//Institution of Engineers.Proceedings of the Second Biennial Australian Engineering Mathematics Conference.Barton:Institution of Engineers,1996:73-78.
[9]HARGREAVES D M,LOWNDESO I S.The computational modeling of the ventilation flows within a rapid development drivage[J].Tunnelling and Underground Space Technology,2007,22(2):150-160.
[10]仇玉良,李宁军,谢永利.喷射混凝土衬砌隧道通风阻力系数测试研究[J].中国公路学报,2005,18(1):81-84.
QIU Yu-liang,LI Ning-jun,XIE Yong-li.Site test for ventilation resistance coefficient of shotcrete lining tunnel[J].China Journal of Highway and Transport,2005,18(1):81-84.
[11]谭信荣,陈寿根,周泽林.钻爆法施工隧道空气质量现场测试[J].地下空间与工程学报,2016,12(2):567-572.
TAN Xin-rong,CHEN Shou-gen,ZHOU Ze-lin.Air quality field testing in tunnel construction with the drilling and blasting method[J].Chinese Journal of Underground Space and Engineering,2016,12(2):567-572.
[12]王明年,邓 涛,于 丽.基于大断面高铁隧道的施工通风时间理论预测方法研究[J].隧道建设(中英文),2018,38(8):1279-1285.
WANG Ming-nian,DENG Tao,YU Li.Study of theoretical prediction method for construction ventilation time required for large-sectional high-speed railway tunnel[J].Tunnel Construction,2018,38(8):1279-1285.
[13]李 琦,于 丽,严 涛,等.高海拔隧道施工通风风管漏风率研究[J].铁道学报,2019,41(1):144-148.
LI Qi,YU Li,YAN Tao,et al.Study on construction ventilation duct leakage rate in high altitude tunnel[J].Journal of the China Railway Society,2019,41(1):144-148.
[14]骆 阳,王英学,宋相帅,等.曲线隧道施工通风沿程阻力损失数值模拟[J].地下空间与工程学报,2020,16(增2):897-903,933.
LUO Yang,WANG Ying-xue,SONG Xiang-shuai,et al.Numercial simulation of construction ventilation resistance loss along the curved tunnel[J].Chinese Journal of Underground Space and Engineering,2020,16(S2):897-903,933.
[15]XIE Z W,XIAO Y M.Application of thermal pressure ventilation technology in extra long construction tunnel with high ground temperature[J].IOP Conference Series:Earth and Environmental Science,2020,541(1):012011.
[16]雷 帅,方 勇,刘 静,等.南大梁高速公路华蓥山隧道施工通风优化研究[J].现代隧道技术,2019,56(02):194-200.
LEI Shuai,FANG Yong,LIU Jing,et al.Research of construction ventilation optimization for Huayingshan Tunnel on Nanchong-Dazhu-Liangping Expressway[J].Modern Tunnelling Technology,2019,56(2):194-200.
[17]赵树磊,王海洋,赵宁雨,等.米拉山隧道独头极限通风距离下污染物运移规律研究[J].隧道建设(中英文),2021,41(增2):367-374.
ZHAO Shu-lei,WANG Hai-yang,ZHAO Ning-yu,et al.Migration law of pollutants under dead-end limit ventilation distance of Milashan Tunnel[J].Tunnel Construction,2021,41(S2):367-374.
[18]张 欣,黄志军,周国宁,等.高寒高海拔隧道施工通风设施性能现场测试及优化[J].资源信息与工程,2019,34(2):151-153.
ZHANG Xin,HUANG Zhi-jun,ZHOU Guo-ning,et al.Field test and optimization of ventilation facility performance in high altitude tunnel construction[J].Resource Information and Engineering,2019,34(2):151-153.
[19]曹正卯,刘 晓,牛柏川.高海拔公路隧道施工期粉尘运移特性研究[J].地下空间与工程学报,2019,15(3):927-935.
CAO Zheng-mao,LIU Xiao,NIU Bai-chuan.Migration characteristics of dust during construction stage in highway tunnels at high altitude areas[J].Chinese Journal of Underground Space and Engineering,2019,15(3):927-935.
[20]ZHOU Y,YANG Y,BU R W,et al.Effect of press-in ventilation technology on pollutant transport in a railway tunnel under construction[J].Journal of Cleaner Production,2020,243:118590.
[21]XIE Z W,XIAO Y M,JIANG G X,et al.Numerical study on fine dust pollution characteristics under various ventilation time in metro tunnel after blasting[J].Building and Environment,2021,204:108111.
[22]TAO Y C,HU H,ZHANG H,et al.A new ventilation system for extra-long railway tunnel construction by using the air cabin relay:A case study on optimization of air cabin parameters length[J].Journal of Building Engineering,2022,45:103480.
[23]ZHOU G,FENG B,YIN W J,et al.Numerical simulations on airflow-dust diffusion rules with the use of coal cutter dust removal fans and related engineering applications in a fully-mechanized coal mining face[J].Powder Technology,2018,339:354-367.
[24]ZHANG G,YUAN S,ZHANG N N,et al.Dust-suppression and cooling effects of spray system installed between hydraulic supports in fully mechanized coal-mining face[J].Building and Environment,2021,204:108106.
[25]GBZ 2.2-2007,工作场所有害因素职业接触限值 第2部分:物理因素[S].
GBZ 2.2-2007,Occupational exposure limits for hazardous agents in the workplace -Part2:Physical agents[S].