[1] 程良奎,张培文,王 帆.岩土锚固工程的若干力学概念问题[J].岩石力学与工程学报,2015,34(4):668-682.
CHENG Liang-kui,ZHANG Pei-wen,WANG Fan.Several mechanical conceptions for anchored structures in rock and soil[J].Chinese Journal of Rock Mechanics and Engineering,2015,34(4):668-682.
[2]KAISER P K,CAI M.Design of rock support system under rockburst condition[J].Journal of Rock Mechanics and Geotechnical Engineering,2012,4(3):215-227.
[3]AKISANYA A R,IVANOVIC A.Debonding along the fixed anchor length of a ground anchorage[J].Engineering Structures,2014,74:23-31.
[4]XU S,HOU P,CAI M.An experiment study on a novel self-swelling anchorage bolt[J].Rock Mechanics and Rock Engineering,2019,52(11):4855-4862.
[5]WU Q,CHEN L,SHEN B,et al.Experimental investigation on rockbolt performance under the tension load[J].Rock Mechanics and Rock Engineering,2019,52(1):4605-4618.
[6]ZOU J F,ZHANG P H.Analytical model of fully grouted bolts in pull-out tests and in situ rock masses[J].International Journal of Rock Mechanics and Mining Sciences,2019,113:278-294.
[7]MARTIN L B,TIJANI M,HADJ-HASSEN F,et al.Assessment of the bolt-grout interface behavior of fully grouted rock bolts from laboratory experiments under axial loads[J].International Journal of Rock Mechanics & Mining Sciences,2013,63:50-61.
[8]LI C C,STJERN G,MYRVANG A.A review on the performance of conventional and energy-absorbing rockbolts[J].Journal of Rock Mechanics and Engineering.2014,6(4):315-327.
[9]FENG B,WANG X,WU Z.Evaluation and prediction of carbon fiber-reinforced polymer cable anchorage for large capacity[J].Advances in Structural Engineering,2019,22(8):1952-1964.
[10]HOBST L,ZAJIC J.Anchoring in rock and soil[M].New York:Elsevier,1983.
[11]周 辉,徐荣超,张传庆,等.预应力锚杆内锚固段长度效应研究[J].岩土力学,2015,36(9):2688-2694.
ZHOU Hui,XU Rong-chao,ZHANG Chuan-qing,et al.Study on length effect of anchorage section in prestressed anchor[J].Rock and Soil Mechanics,2015,36(9):2688-2694.
[12]张友葩,高永涛,吴顺川.预应力锚杆锚固段长度的研究[J].岩石力学与工程学报,2005,12(6):980-986.
ZHANG You-pa,GAO Yong-tao,WU Shun-chuan.Study on the length of anchoring section of prestressed anchor[J].Chinese Journal of Rock Mechanics and Engineering.2005,12(6):980-986.
[13]EHSANI M,SAADATMANESH H,TAO S.Design recommendations for bond of GFRP rebars to concrete[J].Journal of Structural Engineering,1996,122(3):247-254.
[14]COSENZA E,MANFREDI G.development length of FRP straight rears[J].Composites Part B:Engineering,2002,33(7):493-504.
[15]RICHARD G,HRISTOPHE A,SIMON R.Experimental and numerical analysis of in situ pull-out tests on rock bolts in claystones[J].European Journal of Environmental and Civil Engineering,2019,25:1-24.
[16]THENEVIN I,BLANCO-MARTIN L,HADJ-HASSEN F,et al.Laboratory pull-out tests on fully grouted rock bolts and cable bolts:Results and lessons learned[J].Journal of Rock Mechanics and Geotechnical Engineering,2017,9(5):843-855.
[17]程良奎,李象范.岩土锚固土钉喷射混凝土原理设计与应用[M].北京:中国建筑工业出版社,2008.
CHENG Liang-kui,LI Xiang-fan.Principle design and application of shotcrete with rock and soil anchorage [M].Beijing:China Architecture and Building Press,2008.
[18]黄明华,李嘉成,赵明华.岩体离层作用下锚杆受力特性全历程分析[J].岩石力学与工程学报,2017,36(9):2177-2184.
HUANG Ming-hua,LI Jia-cheng,ZHAO Ming-hua.Full-course analysis of the force characteristics of bolts under the action of rock mass separation[J].Chinese Journal of Rock Mechanics and Engineering,2017,36(9):2177-2184.
[19]冯申铎,付文光,李鑫权.深基坑预应力锚杆合理锚固长度的研讨[J].岩土工程学报,2008,30(增1):192-197.
FENG Shen-duo,FU Wen-guang,LI Xin-quan.Discussion on reasonable anchoring length of prestressed anchor in deep foundation pit[J].Chinese Journal of Geotechnical Engineering,2008,30(S1):192-197.
[20]张 雄,陈胜宏.预应力锚索锚固段荷载传递解析算法[J].岩土力学,2015,36(6):1667-1675.
ZHANG Xiong,CHEN Sheng-hong.Analytical algorithm for load transfer in anchor section of prestressed anchor cable[J].Rock and Soil Mechanics,2015,36(6):1667-1675.
[21]李怀珍,李学华.基于界面滑移脱黏的锚杆合理锚固长度研究[J].岩土力学,2017,38(11):3106-3112,3172.
LI Huai-zhen,LI Xue-hua.Study on reasonable anchoring length of bolt based on interface slip and debonding[J].Rock and Soil Mechanics,2017,38(11):3106-3112,3172.