|Table of Contents|

Fatigue life estimation for reinforced concrete bridge deck(PDF)

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

Issue:
2013年02期
Page:
50-55,62
Research Field:
桥梁与隧道工程
Publishing date:

Info

Title:
Fatigue life estimation for reinforced concrete bridge deck
Author(s):
WANG Chun-sheng1 WU Quan-you2 MIAO Wen-hui1
1. Engineering Research Center for Large Highway Structure Safety of the Ministry of Education, Chang'an University, Xi'an 710064, Shaanxi, China; 2. Hangzhou Bay Cross-sea Bridge Administration, Ningbo 315032, Zhejiang, China
Keywords:
bridge engineering concrete bridge deck truck wheel load fatigue life estimation standard fatigue vehicle overload
PACS:
U443.31
DOI:
-
Abstract:
In order to ensure the service safety, it is necessary to evaluate the fatigue life of concrete bridge decks.The fatigue life estimation and prediction models for concrete bridge decks were proposed based on the theory of cumulative fatigue damage, wheel loading test data and the correlation coefficient of actual bridge deck fatigue life and tested fatigue life. Based on the fatigue life estimation model of concrete bridge decks, the effects of the different standard fatigue vehicles in BS5400, Eurocode, AASHTO design codes and truck overload were evaluated. The results show that the technical parameters of the different standard fatigue vehicles have obvious effect on the fatigue life, so a special fatigue vehicle model for concrete bridge decks should be developed; wheel live load spectrum value of BS5400 is the preferred choice under no traffic detection data; the fatigue life of concrete bridge decks decreases greatly at truck overload of 20%, and the fatigue life is less than 10 years at truck overload of 40%. So the trucks with 20% overload must be strictly prohibited to pass the operation concrete bridges. 4 tabs, 4 figs, 17 refs.

References:

[1] JTGD 62—2004,公路钢筋混凝土与预应力混凝土桥涵设计规范[S]. JTGD 62—2004,Code for design of highway reinforced concrete and presterssed concrete bridges and culverts[S].(in Chinese)
[2]Schlafli M,Bruhwiler E.Fatigue of existing reinforced concrete bridge deck slabs[J].Engineering Structures,1998,20(11):991-998.
[3]Feng J H.Reinforced concrete bridge deck fatigue under truck wheel load[D].Detroit:Wayne State University,2003.
[4]Wang C S,Dong X H,Miao W H,Li G.Fatigue safety evaluation of existing reinforced concrete bridges[J].Key Engineering Materials,2009(413-414):749-756.
[5]王春生,周 江,吴全友,等.既有混凝土桥梁疲劳寿命与使用安全评估[J].中国公路学报,2012,25(6):101-107. WANG Chun-sheng,ZHOU Jiang,WU Quan-you,et al.Fatigue life and service safety assessment for existing concretc bridges[J].China Journal of Highway and Transport,2012,25(6):101-107.(in Chinese)
[6] 宋玉普.混凝土结构的疲劳性能及设计原理[M].北京:机械工业出版社,2006. SONG Yu-pu.Fatigue behavior and design principle of concrete structures[M].Beijing:Machinery Industry Press,2006.(in Chinese)
[7]Batchelor B V,Hewitt B E,Csagoly P.An investigation of the fatigue strength of deck slabs of composite steel/concrete bridge[J].Transportation Research Record,1978(664):153-161.
[8]Okada K,Okamura H,Sonoda K.Fatigue failure mechanism of reinforced concrete bridge deck slabs[J].Transportation Research Record,1978(664):136-144.
[9]Sonoda K,Horikawa T.Fatigue strength of reinforced concrete slabs under moving loads[C]//IABSE.Proceedings of the IABSE colloquium,Fatigue of steel and concrete structures.Lausanne:IABSE,1982:455-462.
[10]Tanihira T,Sonoda K,Horikawa T,Kitoh H.Low cycle fatigue characteristics of bridge deck RC slabs under the repetition of wheel loads[C]//New Zealand Concrete Society.Proceedings of Pacific concrete conference.New Zealand:New Zealand Concrete Society,1988:381-392.
[11]Perdikaris P C,Beim S,Bousias S.Slab continuity effect on and fatigue strength of R/C bridge deck models[J].ACI Structural Journal,1989,86(4):483-491.
[12]Matsui S.Fatigue deterioration mechanism and durability of highway bridge RC slabs[R].Osaka:Osaka University,1991.
[13]Perdikaris P C,Petrou M F,Wang A.Fatigue strength and stiffness of reinforced concrete bridge decks[R].Cleveland:Case Western Reserve University,1993.
[14]JTG D60—2004,公路桥涵设计通用规范[S]. JTG D60—2004,General code for design of highway bridges and culverts[S].(in Chinese)
[15]LRFD,Bridge design specifications[S].
[16]BS5400,Part 10,Steel,concrete and composite bridges-part 10:Code of practice for fatigue[S].
[17]Eurocode 3,Design of steel structures-Part 1-9:Fatigue[S].
[14]惠荣炎,黄国兴,易若冰.混凝土的徐变[M].北京:中国铁道出版社,1988. HUI Rong-yan,HUNG Guo-xing,YI Ruo-bing.Concrete creep[M].Beijing:China Railway Publishing House,1988.(in Chinese)
[15]杨小兵.混凝土收缩徐变预测模型研究[D].武汉:武汉大学,2004. YANG Xiao-bing.Study on prediction model of concrete shrinkage and creep[D].Wuhan:Wuhan University,2004.(in Chinese)
[16]Takács P F.Deformations in concrete cantilever bridges:observations and theoretical modelling[D].Norway:The Norwegian University of Sciencs and Technology,2002.
[17]颜东煌,田仲初,李学文,等.混凝土桥梁收缩徐变计算的有限元方法与应用[J].中国公路学报,2004,17(2):55-58. YAN Dong-huang,TIAN Zhong-chu,LI Xue-wen,et al.Calculation of shrinkage and creep of concrete bridge finite element method and application of[J].China Journal of Highway and Transport,2004,17(2):55-58.(in Chinese)
[18]周绪红,乔 朋,狄 谨,等.大跨径简支转连续箱梁桥收缩徐变效应[J].交通运输工程学报,2009,9(2):39-44. ZHOU Xu-hong,QIAO Peng,DI Jin,et al.Shrinkage and creep effects of long-span simple-supported-to-contnuous box girder bridge[J].Joumal of Traffic and Tansportation Engineering,2009,9(2):39-44.(in Chinese)
[19]Dezi L,Leoni G,Tarantino A M.Time-dependent analysis of prestressed composite beams[J].Journal of Structural Engineering,1995,121(4):62l-633.
[20] Meyerson R.Compressive creep of prestressed concrete mixtures with and without mineral admixtures[D].Blacksburg:Virginal Tech,2001.
[21]Mcdonald D B,Roper H.Accuracy of predication models for shrinkage of concrete[J].ACI Materials Journal,1993,56(5):265-271.
[22]Gardner N J,Zhao J W.Creep and shrinkage revisited[J].ACI Materials Journal,1993,90(3):36-46.
[23]Gardner N J,Lockman M J.Design provisions for drying shrinkage and creep of normal-strength concrete[J].ACI Materials Journal,2001,98(2):159-167.

Memo

Memo:
-
Last Update: 2013-04-20