[1] Ayadh M T.Influence of the city geometric features on the two fluid model parameters[D].Virginia:Virginia Polytechnic Institute and State University,1986.
[2]Bhat S C S.Effects of geometric and control features on network traffic:a simulation study[D].Arlington:University of Texas at Arlington,1994.
[3]林 瑜,杨晓光,马莹莹.交通阻塞影响因素分析的正交试验设计方法[J].系统工程,2005,23(10):39-43.
LIN Yu,YANG Xiao-guang,MA Ying-ying.An analysis of factors causing congestion with the application of orthogonal experimental design method [J].Systems Engineering,2005,23(10):39-43.(in Chinese)
[4]尹洪英,徐丽群,权小锋.基于解释结构模型的路网脆弱性影响因素分析[J].软科学,2010,24(10):122-126.
YIN Hong-ying,XU Li-qun,QUAN Xiao-feng.Research on influencing factors of road network's vulnerability based on interpretive structural model [J].Soft Science,2010,24(10):122-126.(in Chinese)
[5]卢 树,陆化普,唐忠华,等.城市道路行程车速影响因素分析[J].公路交通科技,2003,20(1):89-92.
LU Shu,LU Hua-pu,TANG Zhong-hua,et al.Analysis of influencing factors on urban travel speed[J].Journal of Highway and Transportation Research and Development,2003,20(1):89-92.(in Chinese)
[6]戢晓峰.基于粗糙集的路网瓶颈路段识别方法[J].公路交通科技,2009,26(9):120-127.
JI Xiao-feng.Method of bottleneck links identification in road network based on rough set[J].Journal of Highway and Transportation Research and Development,2009,26(9):120-127.(in Chinese)
[7]全永燊,温慧敏,潘昭宇.“治堵”还是“致堵”?——对当前治理城市交通拥堵对策的反思[J].城市,2011(9):39-43.
QUAN Yong-shen,WEN Hui-min,PAN Zhao-yu.“Governance jam” or “cause jam”?——Reflection on the current urban traffic congestion management countermeasures[J].City,2011(9):39-43.(in Chinese)
[8]Slezak D,Ziarko W.The investigation of the Bayesian rough set model[J].International Journal of Approximate Reasoning,2005,40(1/2):81-91.
[9]上海市第四次综合交通调查总报告[R].上海:上海市城乡综合交通规则研究所.2010.
The Shanghai Urban Construction and Transportation Commission,Shanghai City Integrated Transportation Planning Research Institute,Shanghai Fourth Comprehensive Traffic Survey Office.Shanghai fourth comprehensive transportation survey general report[R].2010.(in Chinese)
[10]Koczkodaj W W,Orlowski M,Marek V W.Myths about rough set theory[J].Communications of the ACM,1998,41(11):102-103.
[11]Yao Y Y,Zhao Y,Wang J.On reduct construction algorithms.In:Transactions on Computational Science II,LNCS 5150[M].Berlin:Springer-Verlag,2008.
[12]王国胤.决策表属性核的计算方法[J].计算机学报,2003,26(5):611-615.
WANG Guo-yin.Decision table attribute core calculation methods[J].Computer Science,2003,26(5):611-615.(in Chinese)
[13]杨 明.一种基于改进差别矩阵的核增量式更新算法[J].计算机学报,2006,9(3):407-413.
YANG Ming.A difference matrix based on the improved core incremental updating algorithm[J].Computer Science,2006,9(3):407-413.(in Chinese)
[14]Pawlak Z.New look on Bayes' theorem-the rough set outlook[C]//Hirano S,Inuiguchi M,Tsumoto S.The Proceedings of RSTGC'2001,Bulletin of International Rough Set Society.Osaka:Shimane 2001,5(1):1-8.
[15]Pawlak Z.A rough set view on Bayes' theorem[J].International Journal of Intelligent Systems,2003,18(5):487-498.
[16]Slezak D,Ziarko W.Bayesian rough set model[C]//Proceedings of the International Workshop on Foundation of Data Mining(FDM'2002).Maebashi:EDM,2002:131-135.