[1] 徐 岳,邹存俊,任更锋,等.自锚式悬索与斜拉组合体系桥梁使用阶段模型试验[J].长安大学学报:自然科学版,2009,29(2):46-50.
XU Yue,ZOU Cun-jun,REN Geng-feng,et al.Model test of self-anchored suspension and cable-stayed combination bridge in service stage[J].Journal of Chang'an University:Natural Science Edition,2009,29(2):46-50.(in Chinese)
[2]周绪红,武 隽,狄 谨.大跨径自锚式悬索桥受力分析[J].土木工程学报,2006,39(2):42-45.
ZHOU Xu-hong,WU Jun,DI Jin.Mechanical analysis for long-span self-anchored suspension bridges [J].China Civil Engineering Journal,2006,39(2):42-45.(in Chinese)
[3]程 斌,孙海涛,肖汝诚.自锚式悬索桥的主缆线形计算与误差分析[J].华南理工大学学报:自然科学版,2008,36(6):17-24.
CHENG Bin,SUN Hai-tao,XIAO Ru-cheng.Calculation and error analysis of configuration of main cable for self-anchored suspension bridge[J].Journal of South China University of Technology:Natural Science Edition,2008,36(6):17-24.(in Chinese)
[4]曾广武,吴东粤.单塔空间索面自锚式悬索桥缆索系统安装的施工监控[J].桥梁建设,2008(5):57-59.
ZENG Guang-wu,WU Dong-yue.Construction monitoring and control of cable system installation of a single tower and spatial cable plane self-anchored suspension bridge[J].Journal of Bridge Construction,2008(5):57-59.(in Chinese)
[5]胡建华,沈锐利,张贵明,等.佛山平胜大桥全桥模型试验研究[J].土木工程学报,2007,40(5):17-25.
HU Jian-hua,SHEN Rui-li,ZHANG Gui-ming,et al.A total bridge model study of the pingsheng bridge in foshan[J].China Civil Engineering Journal,2007,40(5):17-25.(in Chinese)
[6]张俊平,黄海云,刘爱荣,等.空间缆索自锚式悬索桥体系转换过程中受力行为的全桥模型试验研究[J].土木工程学报,2011,44(2):108-115.
ZHANG Jun-ping,HUANG Hai-yun,LIU Ai-rong,et al.An overall bridge model test study on the mechanical behaviors in the process of system transformation of self-anchored susension bridge with satial cable system[J].China Civil Engineering Journal,2011,44(2):108-115.(in Chinese)
[7]王会利,秦泗凤,谭岩斌,等.自锚式斜拉-悬索协作体系桥模型试验研究[J].武汉理工大学学报:交通科学与工程版,2009,34(1):57-59.
WANG Hui-li,QIN Si-feng,TAN Yan-bin,et al.Experiment research on self- anchored cable- stayed suspension bridge model[J].Journal of Wuhan University of Technology:Transportation Science & Engineering,2009,34(1):57-59.(in Chinese)
[8]赵 煜,汤金涛,周勇军,等.三塔斜拉-自锚式悬索组合结构计算方法及参数分析[J].西安科技大学学报,2011,31(5):573-579.
ZHAO Yu,TANG Jin-tao,ZHOU Yong-jun,et al.Calculation method and parameter analysis of self-anchored suspension and cable-stayed compositestructure with three towers[J].Journal of Xi'an University of Science and Technology,2011,31(5):573-579.(in Chinese)
[9]颜东煌,田仲初,陈常松,等.岳阳洞庭湖大桥三塔斜拉桥全桥静动力模型设计[J].长沙交通学院学报,1999,15(3):50-54.
YAN Dong-huang,TIAN Zhong-chu,CHEN Chang-song,et al.Static and dynamic model design of the total bridge of yueyang tongting three tower cable-stayed bridge[J].Journal of Changsha Communications University,1999,15(3):50-54.(in Chinese)