[1] 张丰焰,周 伟.高速公路改扩建工程交通组织设计探讨[J].公路,2006(1):109-113.
ZHANG Feng-yan,ZHOU Wei.Discussion about traffic operation design for reconstruction and expansion engineering of expressways[J].Highway,2006(1):109-113.(in Chinese)
[2]Chen H C,Schonfeld P.Work zone lengths for a four-lane road with an alternate route[R].Washington DC:Transportation Research Board,2003.
[3]Chien S,Schonfeld P.Optimal work zone lengths for four-lane highways[J].Journal of Transportation Engineering,2001,127(2):124-131.
[4] Byrd P S,Pesti G,Jessen D S,et al.Traffic flow characteristics of the late merge work zone control strategy[R].Washington DC:Transportation Research Board,1999.
[5] 徐美丽.高速公路改扩建施工区交通流组织研究[D].西安:长安大学,2011.
XU Mei-li.Study on traffic organization in reconstruc-tion and extension work zone of expressway [D].
Xi'an: Chang'an University,2011.(in Chinese)
[6] 裴玉龙,张亚平.道路交通系统仿真[M].北京:人民交通出版社,2004.
PEI Yu-long,ZHANG Ya-ping.Road traffic system simulation[M].Beijing: China Communication Press,2004.(in Chinese)
[7] 周茂松,吴 兵,盖松雪.高速公路养护维修作业区通行能力影响因素的微观仿真研究[J].交通与计算机,2004,22(6):54-57.
ZHOU Mao-song,WU Bing,GAI Song-xue.Micro-simulation of factors affecting passing capacity in freeway maintenance work zones[J].Computer and Communications,2004,22(6):54-57.(in Chinese)
[8] 李永义.高速公路施工路段交通组织方案设计与评价研究[D].南京:东南大学,2006.
LI Yong-yi.Study on traffic organization and project
evaluation of expressway works sections[D].
Nanjing: Southeast University,2006.(in Chinese)
[9] 袁春建.高速公路养护区交通组织仿真研究[D].西安:长安大学,2009.
YUAN Chun-jian.Research on traffic organization simulation of expressway work zone[D].Xi'an: Chang'an University,2009.(in Chinese)