|Table of Contents|

Assessment on remanufacturability of waste parts for process route(PDF)

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

Issue:
2012年03期
Page:
105-110
Research Field:
汽车与机械工程
Publishing date:

Info

Title:
Assessment on remanufacturability of waste parts for process route
Author(s):
LIU Qing-tao CAI Zong-yan LIU Xiao-ting ZAN Jie LIANG Hu
Key Laboratory for Highway Construction Technology and Equipment of the Ministry of Education, Chang'an University, Xi'an 710064, Shaanxi, China
Keywords:
mechanical engineering waste parts remanufacturability assessment process route
PACS:
TH12
DOI:
-
Abstract:
Waste product is the object of remanufacturing, and its waste parts' remanufacturability needs to be assessed before remanufacturing, and the remanufacturability for each waste part is relevant to the process route. According to those uncertain factors of waste parts in terms of different materials, failure types and failure degree, the assessment model of remanufacturability of waste parts for process route was established on the benchmark of the original manufacturing data and the national environmental emission standards. The model includs two sub-modules of competitive assessment model and sustainable assessment model, the remanufacturability of waste parts is assessed by analytic hierarchy process from four feasibility aspects of economic, quality, resources and environment respectively, and the optimal remanufacturing process routes are selected for waste parts which are suitable for remanufacturing. Finally, an example of remanufacturability assessment for waste engine parts is studied. The results show that the assessment method can solve engineering and technical operation of remanufacturing for specific, personality waste parts effectively. 3 tabs, 1 fig, 8 refs.

References:

[1] Guide J.Production planning and control for remanufacturing:industry practice and research needs[J].Journal of Operations Management,2001,8(4):467-483.
[2]张国庆,荆学东,浦耿强,等.汽车发动机可再制造性评价[J].中国机械工程,2005,16(8):739-742. ZHANG Guo-qing,JING Xue-dong,PU Geng-qiang,et al.Assessment on remanufacturability of the automobile engines[J].China Mechanical Engineering,2005,16(8):739-742.
[3]Sundin E,Bras B.Making functional sales environmentally and economically beneficial through product remanufacturing[J].Journal of Cleaner Production,2005,13(9):913-925.
[4]Majumder P.Competition in remanufacturing[J].Production and Operations Management,2001,10(2):125-141.
[5]曹华军,王本涛,刘 飞,等.再制造工艺过程二阶优化决策方法[J].计算机集成制造系统,2010,16(5):935-941. CAO Hua-jun,WANG Ben-tao,LIU Fei,et al.Two phase decision-making strategy for remanufacturing process planning[J].Computer Integrated Manufacturing Systems,2010,16(5):935-941.
[6]Seitz M.A critical assessment of motives for product recovery:the case of engine remanufacturing[J].Journal of Cleaner Production,2007,15(12):1147-1157.
[7]Jovane F,Yoshikawa H,Alting L,et al.The incoming global technological and industrial revolution towards competitive sustainable manufacturing[J].CIRP Annals Manufacturing Technology,2008(57):641-659.
[8]徐滨士.再制造与循环经济[M].北京:科学出版社,2007.

Memo

Memo:
-
Last Update: 2012-08-20