[1] 徐贤德,李 杨.铁路正交连续梁桥斜交墩的设计与应用[J].铁道工程学报,2010(8):62-66.
XU Xian-de,LI Yang.Design and application of skew pier of railway orthogonal continuous beam bridge[J].Journal of Railway Engineering Society,2010(8):62-66.
[2]乔 健,阚 越.斜交跨河设桥的思考[J].铁道标准设计,2004(4):25.
QIAO Jian,KAN yue.Thinking of oblique crossing a bridge[J].Railway Standard Design,2004(4):25.
[3]李天恩.铁路斜交桥梁的设置[J].科技交流,2004(1):82-84.
LI Tian-en.The set of railway oblique bridge[J].Communication of Science and Technology.2004(1):82-84.
[4]李学罡,蔡明兮,韦成龙.材料力学[M].长春:吉林科学技术出版社,2006.
[5]陈永辉,王新泉.公路软土地基处理中Y型沉管灌注桩异形特性研究[J].中国公路学报,2008,21(5):19-25.
CHEN Yong-hui,WANG Xin-quan.Research on abnormity characteristic of Y-shaped tube-sinking cast-in-situ pile in highway soft ground[J].China Journal of Highway and Transport,2008,21(5):19-25.
[6]姚玲森,项海帆,顾安邦.桥梁工程[M].北京:人民交通出版社,2008.
[7]同济大学应用数学系.高等数学[M].北京:高等教育出版社,2002.
[8]田务国.连续函数极值的求法[J].科学咨询,2008(增2):74-75.
TIAN Wu-guo.Calculation method of extreme value of continuous function[J].Policy & Scientific Consult,2008(S2):74-75.
[9]祝明桥,蒋伟中,霍海强.混凝土巨型箱形截面梁及其设计理论[J].建筑科学与工程学板,2010,27(3):85-88.
ZHU Ming-qiao,JIANG Wei-zhong,HUO Hai-qiang.Concrete huge box section girder and its design theory[J].Journal of Architecture and Civil Engineering,2010,27(3):85-88.
[10]Ali K H M,Kamil O.Simulation of flow around piers[J].Journal of Hydraulic Research,2002,40(2):161-174.