[1] 罗利锐,刘志刚.断层对隧道围岩稳定性的影响[J].地质力学学报,2009,15(3):226-232.
LUO Li-rui,LIU Zhi-gang.Influenece of fault crush belts on the stability of tunnel rock[J].Journal of Geomechanics,2009,15(3):226-232.
[2]张 楠,王述红,王晓明,等.含弱层围岩的隧道变形破坏过程模型实验研究[J].地下空间与工程学报,2007,3(6):1085-1088.
ZHANG Nan,WANG Shu-hong,WANG Xiao-ming,et al.Model study on mechanism of deformation and destruction of the surrounding rock in tunnel [J].Chinese Journal of Underground Space and Engineering,2007,3(6):1085-1088.
[3]方建勤,胡居义,林才奎,等.茶林顶隧道地应力演化及断层带施工力学分析[J].地下空间与工程学报,2009,5(3):536-539.
FANG Jian-qin,HU Ju-yi, LIN Cai-kui,et al.Analysis on geo-stress evolution and construction mechanics of fault zone for Chalinding tunnel[J].Chinese Journal of Underground Space and Engineering,2009,5(3):536-539.
[4]廖秋林,侯哲生,何小东,等.断层影响下隧道围岩变形监测与特征分析[J].水文地质工程地质,2005(6):102-106.
LIAO Qiu-lin,HOU Zhe-sheng,HE Xiao-dong,et al.Monitoring and analysis on the deformation of tunnel surrounding rock affected by faults[J].Hydrogeology and Engineering Geology,2005(6):102-106.
[5]李为腾,李术才,薛翊国,等.地质雷达在胶州湾海底隧道F4-5含水断层超前预报中的应用[J].山东大学学报:工学版,2009,39(4):65-68.
LI Wei-teng,LI Shu-cai,XUE Yi-guo,et al.Application of ground penetrating radar to the geological forecast for water-bearing faults in the Jiaozhou bay sub-sea tunnel construction[J].Journal of Shandong University:Engineering Science,2009,39(4):65-68.
[6]罗利锐,刘志刚,陈文涛,等.红外探测技术在海底隧道地质预报中的应用[J].地下空间与工程学报,2010,6(4):775-780.
LUO Li-rui,LIU Zhi-gang,CHEN Wen-tao,et al.Application of infrared acquisition technology in geological prediction of sub-sea tunnel[J].Chinese Journal of Underground Space and Engineering,2010,6(4):775-780.
[7]李天斌,孟陆波,朱 劲,等.隧道超前地质预报综合分析方法[J].岩石力学与工程学报,2009,28(12):2429-2436.
LI Tian-bin,MENG Lu-bo,ZHU Jin,et al.Comprehensive analysis method for advanced forecast of geology in tunnels[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(12):2429-2436.
[8]李 围.不同溶洞条件下公路隧道施工的关键技术[J].筑路机械与施工机械化,2010,27(10):68-71.
LI Wei.Key technologies for construction of highway tunnel under different karst caverns[J].Road Machinery & Construction Mechanization,2010,27(10):68-71.
[9]陶 坤,李小龙,石红磊.长大管棚在隧道浅埋段的施工技术和质量控制[J].筑路机械与施工机械化,2010,27(10):65-69.
TAO Kun, LI Xiao-long,SHI Hong-lei.Construction technology and quality control of big-long pipe-roof in shallowly buried section of tunnel[J].Road Machinery & Construction Mechanization,2010,27(10):65-69.
[10]龚建伍,夏才初,朱合华,等.鹤上大断面小净距隧道施工方案优化分析[J].岩土力学,2009,30(1):236-240.
GONG Jian-wu,XIA Cai-chu,ZHU He-hua,et al.Optimal analysis of construction schemes for Heshang small-space tunnels with large section[J].Rock and Soil Mechanics,2009,30(1):236-240.
[11]张学言,闫澍旺.岩土塑性力学基础[M].2版.天津:天津大学出版社,2006.
[12]夏才初,龚建伍,唐 颖,等.大断面小净距公路隧道现场监测分析研究[J].岩石力学与工程学报,2007,26(1):44-50.
XIA Cai-chu,GONG Jian-wu,TANG Ying,et al.Study on site monitoring of large-section highway tunnels with small clear spacing[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(1):44-50.
[13]庄 宁,廖少明,孙忠成,等.大跨度小净距群洞隧道施工方案优化研究[J].地下空间与工程学报,2007,3(1):96-100.
ZHUANG Ning,LIAO Shao-ming,SUN Zhong-cheng,et al.Optimization analysis of construction schemes for large span and small clear distance group tunnels[J].Chinese Journal of Underground Space and Engineering,2007,3(1):96-100.
[14]JTG D70—2004,公路隧道设计规范[S].