[1] 龚文阶.混凝土箱梁桥裂缝成因及预防措施研究[J].湖南交通科技,2007,33(2):80-82,86.
GONG Wen-jie.Research on cause and prevention measure for cracks in concrete box-girder bridge[J].Hunan Communication Science and Technology,2007,33(2):80-82,86.
[2]朱利明,刘 华.三腹板预应力混凝土连续箱梁底板纵向裂缝病害原因分析及对策[J].桥梁建设,2005(增):114-116.
ZHU Li-ming,LIU Hua.Cause analysis and countermeasures for longitudinal cracks in bottom slab of prestressed concrete continuous box girder with triple webs[J].Bridge Construction,2005(S):114-116.
[3]田相合,陈水福.预应力混凝土连续箱梁桥裂缝的检测与分析[J].市政技术,2004,22(1):46-49.
TIAN Xiang-he,CHEN Shui-fu.Analysis and detect for cracks in prestressed concrete continuous boe-girder bridges[J].Municipal Engineering Technology,2004,22(1):46-49.
[4]尹卫华.预应力混凝土箱梁底部出现纵向裂缝的分析[J].山西建筑,2007,33(27):147-148.
YIN Wei-hua.Analysis of vertical cracks at prestress concrete pile bottom[J].Shanxi Architecture,2007,33(27):147-148.
[5]潘钻峰,吕志涛.大跨径连续刚构桥主跨底板合龙预应力束的空间效应研究[J].世界桥梁,2006(4):36-39.
PAN Zuan-feng,LU Zhi-tao.Study of spatial effect of closure prestressing strands in main span bottom slab of long span continuous rigid-frame bridge[J].World Bridges,2006(4):36-39.
[6]包立新,杨广来,杨文军.对连续刚构桥底板开裂问题的探讨[J].公路,2004(8):39-41.
BAO Li-xin,YANG Guang-lai,YANG Wen-jun.Discuss on bottom plate cracking problem of continuous rigid-frame bridges[J].Highway,2004(8):39-41.
[7]陈露晔,陈 瑶.预应力混凝土连续刚构桥底板外崩及对策研究[J].华东公路,2008(1):43-46.
CHEN Lu-ye,CHEN Yao.Research on countermeasure for bottom plate collapsing of prestressed concrete continuous rigid-frame bridge[J].Eastern China Highway,2008(1):43-46.
[8]程 灏.大跨度预应力混凝土连续刚构桥箱梁底板裂缝成因分析[J].贵州工业大学学报:自然科学版,2008,37(3):170-174.
CHENG Hao.The analysis of the cause of crack in bottom slab of a large span prestressed concrete continuous rigid frame bridge[J].Journal of Guizhou University of Technology:Natural Science Edition,2008,37(3):170-174.
[9]Babu K,Devdas M.Correction of errors in simplified transverse bending analysis of concrete box-girder bridges[J].Journal of Bridge Engineering,2005,10(6):650-657.
[10]方 志,张志田.钢筋混凝土箱梁横向受力有效分布宽度的试验研究[J].中国公路学报,2001,14(1):35-38.
FANG Zhi,ZHANG Zhi-tian.Research on the effective distribution width of transverse force of reinforce concrete box beam[J].China Journal of Highway and Transport,2001,14(1):35-38.
[11]王 晖,项贻强.梯形多室箱梁横向内力计算方法研究[J].公路交通科技,2007,24(1):83-86.
WANG Hui,XIANG Yi-qiang.Research on calculation method of the transverse internal force of trapezoid multi-cellular box girder bridge[J].Journal of Highway and Transportation Research and Development,2007,24(1):83-86.
[12]郑 振.连续刚构弯箱梁桥横向内力计算方法[J].中国公路学报,2000,13(4):57-61.
ZHENG Zhen.Calculation method of the continuous rigid frame curved box girde[J].China Journal of Highway and Transport,2000,13(4):57-61.