[1] 黄福云,陈宝春.钢管混凝土拱桥初应力问题[J].哈尔滨工业大学学报,2005,37(增):54-58.
HUANG Fu-yun,CHEN Bao-chun.Review of initial stress on concrete filled steel tubular arch bridge[J].Journal of Harbin Institute of Technology,2005,37(S):54-58.
[2]钟善桐,查晓雄.钢管初应力对钢管混凝土构件承载力影响的研究[J].哈尔滨建筑大学学报,1997,30(3):13-22.
ZHONG Shan-tong,ZHA Xiao-xiong.Research of the influence of initial stress in steel tube on load carrying capacity for concrete filled steel tubular(CFST)members[J].Journal of Harbin University of Civil Engineering and Architecture,1997,30(3):13-22.
[3]查晓雄,钟善桐.用有限元法分析钢管初应力对钢管混凝土轴压构件基本性能的影响[J].哈尔滨建筑大学学报,1997,30(1):41-49.
ZHA Xiao-xiong,ZHONG Shan-tong.The behavior effect on concrete filled steel tubular members subjected to compression under the initial stress of steel tube based on the finite element method[J].Journal of Harbin University of Civil Engineering and Architecture,1997,30(1):41-49.
[4]韩林海,尧国皇.钢管初应力对钢管混凝土压弯构件承载力的影响研究[J].土木工程学报,2003,36(4):9-18.
HAN Lin-hai,YAO Guo-huang.Effect of initial stress on bearing capacity of concrete-filled steel tubular beam-columns[J].China Civil Engineering Journal,2003,36(4):9-18.
[5]肖世为.巫峡长江大桥钢管混凝土构件极限承载力试验研究报告[R].重应:重庆大学,2008.
[6]周水兴.钢管初应力对钢管混凝土拱桥承载力的影响研究[D].重庆:重庆大学,2007.
[7]周水兴,李 炎.钢管混凝土拱桥设计与发展[J].工程力学,1999,3(增):225-229.
ZHOU Shui-xing,LI Yan.Design and development of CFST arch bridge[J].Engineering Mechanics,1999,3(S):225-229.
[8]卜东平.山区高墩大跨斜拉桥施工技术创新研究[J].筑路机械与施工机械化,2009,26(4):14-19.
BU Dong-ping.Innovative research on construction technology of high-pier-long-span cable-stayed bridge in mountain area[J].Road Machinery & Construction Mechanization,2009,26(4):14-19.
[9]李永乐,邸月龙,赵 彤,等.大跨高墩城市轨道交通斜拉桥动力特性及抗风性能[J].建筑科学与工程学报,2010,27(4):19-24.
LI Yong-le,DI Yue-long,ZHAO Tong,et al.Dynamic characteristic and wind resistance behavior of high-pier long-spon cable-stayed bridge for urban rail transit[J].Journal of Architecture and Civil Engineering,2010,27(4):19-24.
[10]赵跃宇,易壮鹏,王连华.初始应力对钢管混凝土拱桥面内极限承载力的影响[J].湖南大学学报:自然科学版,2007,34(3):1- 5.
ZHAO Yue-yu,YI Zhuang-peng,WANG Lian-hua.Effects of initial stress on the in-plane ultimate bearing capacity of CFST arch bridges[ J].Journal of Hunan University:Natural Science,2007,34( 3):1- 5.
[11]杨孟刚,曹志光.初应力对大跨度钢管混凝土拱桥极限承载力的影响[J].铁道科学与工程学报,2010,7(4):6-10.
YANG Meng-gang,CAO Zhi-guang.Influence of initial stress on the ultimate bearing capacity of long- span CFST arch bridges[J].Journal of Railway Science and Engineering,2010,7(4):6-10.
[12]鹿安理,史清宇,赵海燕,等.焊接过程仿真领域的若干关键技术问题及其初步研究[J].中国机械工程,2000,11(2):201-205.
LU An-li,SHI Qing-yu,ZHAO Hai-yan,et al.Key techniques and some tentative research of welding process simulation[J].China Mechanical Engineer- ing,2000,11(2):201-205.
[13]侯维廉.在残余应力场中凸锥柱结合壳结构的裂纹扩展速率预报[J].舰船性能研究,1990(4):53-60.
HOU Wei-lian.The residual stress in convex cones column in the combined shell structure crack propagation rate forecast[J].Ships Performance Study,1990(4):53-60.
[14]林吉如,丁荣华.舰船结构焊接残余应力[J].舰船性能研究,1990(2):83-93.
LIN Ji-ru,DING Rong-hua.Ship structure welding residual stress[J].Ships Performance Study,1990(2):83-93.
[15]Chini S A,Wolde-Tinsae A M.Effect of prestressing on elastic arch[J].Journal of Engineering Mechanics,1988,114(10):1791-1800.