|Table of Contents|

Steady calculation method and its application of complex highway tunnel’s fire ventilation network(PDF)

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

Issue:
2011年05期
Page:
57-62
Research Field:
Publishing date:
2011-10-20

Info

Title:
Steady calculation method and its application of complex highway tunnel’s fire ventilation network
Author(s):
WU Feng-liang
School of Energy Science and Engineering, Xi'an University of Science and Technology, Xi'an 710054, Shaanxi, China
Keywords:
tunnel engineering complex highway tunnel tunnel fire ventilation network steady heat transfer
PACS:
U459.2
DOI:
-
Abstract:
Aiming at the calculation of temperature and air flow amount in a highway tunnel on fire, a steady allocation method of air flow in a tunnel network with the mass flow as unknown and traffic wind pressure was analyzed. Based on the steady heat transfer between surrounding rock and smoke flow, the calculation equation of tunnel's air flow temperature was derived. Under the conditions of fire, the heat wind pressure in each part of a tunnel was obtained by adopting the average air flow temperature. The iteration process between a ventilation network calculation and a steady heat transfer for the heat wind pressure was presented. The software of this model was also programmed and applied in a parallel-heading and semi-transverse ventilation tunnel on a 50MW fire. As a sample, the time for rescue and measurement for controlling the smoke flow were analyzed. The results indicate that the heat pressure and allocated air flow amount depend on each other, so the calculation precision of heat wind pressure with iteration can be improved; the software based on the model makes it easy to calculating an arbitrary complex tunnel on fire which occurring in any location of the tunnel, so this helps to constitute the fire schemes during the designation and operation management of a tunnel. 2 tabs, 7 figs, 11 refs.

References:

[1] 吕康成,伍毅敏.特长公路隧道排送组合通风设计计算[J].长安大学学报:自然科学版,2009,29(5):81-85. LU Kang-cheng,WU Yi-min.Design calculation for longitudinal ventilation in extra long tunnel with air ejecting and blowing system[J].Journal of Chang'an University:Natural Science Edition,2009,29(5):81-85.
[2]胡金平,谢永利,李宁军,等.公路隧道通风网络中交通风的计算原理及应用[J].现代隧道技术,2004,41(5):12-15. HU Jin-ping,XIE Yong-li,LI Ning-jun,et al.Principle of the calculation of traffic wind and its application in the ventilation network of a highway tunnel[J].Modern Tunnelling Technology,2004,41(5):12-15.
[3]仇玉良.公路隧道复杂通风网络分析技术研究[D].西安:长安大学,2004.
[4]夏永旭,周勇狄,王永东.公路隧道火灾时人员逃生研究[J].土木工程学报,2009,42(8):115-123. XIA Yong-xu,ZHOU Yong-di,WANG Yong-dong.A study of people escape in highway tunnel fires[J].China Civil Engineering Journal,2009,42(8):115-123.
[5]王晓雯,陈树汪.公路隧道火风压及烟流速度计算模型[J].地下空间与工程学报,2005,1(1):95-101. WANG Xiao-wen,CHEN Shu-wang.A math model of fire pressure & smog velocity at highway tunnel fire[J].Chinese Journal of Underground Space and Engineering,2005,1(1):95-101.
[6]张素磊,张顶立,董晓明,等.Scott-Hinsley回路法在公路隧道平导半横向式通风计算中的应用[J].北京交通大学学报,2010,34(4):45-49. ZHANG Su-lei,ZHANG Ding-li,DONG Xiao-ming.Application of Scott-Hinsley loop algorithm in calculation of highway tunnel parallel-heading and semi-transverse ventilation mode[J].Journal of Beijing Jiaotong University,2010,34(4):45-49.
[7]王红刚,张素磊,董晓明.基于.Net的公路隧道风网解算可视化软件开发[J].中国安全生产科学技术,2008,4(2):61-64. WANG Hong-gang,ZHANG Su-lei,DONG Xiao-ming.The visual software development of highway tunnel ventilation based on.Net[J].Journal of Safety Science and Technology,2008,4(2):61-64.
[8]王惠宾,胡卫民,李湖生.矿井通风网络理论与算法[M].徐州:中国矿业大学出版社,1994.
[9]常心坦.矿井火灾通风的模拟计算[J].煤矿安全,1991(4):22-29. CHANG Xin-tan.Simulation of coal mine ventilation on fire[J].Safety in Coal Mines,1991(4):22-29.
[10]吕康成.公路隧道运营管理[M].北京:人民交通出版社,2006:38-39.
[11]吴奉亮,周 澎,李 晖,等.基于智能对象的矿井通风CAD模型研究[J].煤炭科学技术,2009,37(5):54-57. WU Feng-liang,ZHOU Peng,LI Hui,et al.Research on mine ventilation CAD model based on intelligent object[J].Coal Science and Technology,2009,37(5):54-57.

Memo

Memo:
-