[1] Harsh S,Darwin D.Traffic-induced vibrations and bridge deck repairs[J].Concrete International,1986,8(5):36-42.
[2]赵仙茹.软土地基上旧路拓宽高路堤全过程沉降预测[J].筑路机械与施工机械化,2009,26(9):40-42.
ZHAO Xian-ru.Settlement prediction in whole process of high embankment broadening on soft soil foundation[J].Road Machinery & Construction Mechanization,2009,26(9):40-42.
[3]Issa M A.Investigation of cracking in concrete bridge decks at early ages[J].Journal of Bridge Engineering,1999,4(2):116-124.
[4]Ansell A,Silfwerbrand J.The vibration resistance of young and early-age concrete[J].Structural Concrete,2003,4(3):125-134.
[5]ACI Committee 345 2R-98,Guide for widening highway bridges[S].
[6]沈蒲生,方 辉,夏心红,等.考虑施工过程和收缩徐变的框架结构简化分析[J].建筑科学与工程学报,2006,23(2):41-45.
SHEN Pu-sheng,FANG Hui,XIA Xin-hong,et al.Simplified analysis for frame structure considering construction process,shrinkage and creep[J].Journal of Architecture and Civil Engineering,2006,23(2):41-45.
[7]李孟绪.公路扩建与沉降分析[J].筑路机械与施工机械化,2008,25(4):58-60.
LI Meng-xu.Analysis of highway's extension and settlement[J].Road Machinery & Construction Mechanization,2008,25(4):58-60.
[8]Huber H,Schwartz J L,Frey R P.Rehabilitation of the devil's bridge over Schollenen gorge[J].Structural Engineering International,2000,10(1):23-25.
[9]Montero A C.Effect of maintaining traffic during widening of bridge decks:a case study[D].Ohio:Ohio State University,1980.
[10]Kwan A K H,Ng P L.Reducing damage to concrete stitches in bridge decks[J].Proceedings of the Institute of Civil Engineers:Bridge Engineering,2006,159(2):53-62.
[11]Hilsdorf H K,Lott J L.Revibration of retarded concrete for continuous bridge decks[R].Washington DC:National Academy of Sciences,1970.
[12]Furr H L,Fouad F H.Effect of moving traffic on fresh concrete during bridge-deck widening[J].Transportation Research Record,1982(86):28-36.
[13]Ng P L,Kwan A K H.Effects of traffic vibration on curing concrete stitch part II:cracking,debonding and strength reduction[J].Engineering Structures,2007,29(11):2881-2892.