|Table of Contents|

Model test and numerical simulation on tunnel semi-transverse ventilation system(PDF)

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

Issue:
2011年01期
Page:
63-68
Research Field:
Publishing date:
2011-02-28

Info

Title:
Model test and numerical simulation on tunnel semi-transverse ventilation system
Author(s):
REN Rui XIE Yong-li
School of Highway, Chang'an University, Xi'an 710064, Shaanxi, China
Keywords:
tunnel engineering immersed tunnel physical model semi-transverse ventilation computational fluid dynamic
PACS:
U453.5
DOI:
-
Abstract:
In order to study the distribution of wind speed and wind press in the tunnel with semi-transverse ventilation system, considering semi-transverse exhaust ventilation of a certain immersed tunnel, this paper established a reduced scale physical model with 1:9 ratio of prototype and a three-dimensional numerical simulation model with 1:1 ratio of prototype, reached the impact of the number of the open ventilation vents and the position of the open ventilation vents on the distribution of wind speed and wind press in the tunnel. The results show that: under the same exhaust power, the exhaust volume increases with the increasing number of the open ventilation vents; opening tow ventilation vents and setting the position of the first ventilation vents, with the increasing of the distance between the tow ventilation vents, the exhaust volume through the first ventilation vents increases but the rout of the smock spreading to the second ventilation vents is added. 4 tabs, 9 figs, 18 refs.

References:

[1] 吴德兴,李伟平,杨 健.苍岭特长公路隧道通风系统创新设计[C]//中国公路学会隧道分会.2006年公路隧道运营管理与安全国际学术会议论文集.重庆:重庆大学出版社,2006:205-211.
[2]吕康成,武毅敏.特长公路隧道送排组合通风设计计算[J].长安大学学报:自然科学版,2009,29(5):81-85. LU Kang-cheng,WU Yi-min.Design calculation for longitudinal ventilation in extra long tunnel with air ejecting and blowing system[J].Journal of Chang'an University:Natural Science Edition,2009,29(5):81-85.
[3]夏永旭,赵 峰.特长公路隧道纵向-半横向混合通风方式研究[J].中国公路学报,2005,18(3):80-83. XIA Yong-xu,ZHAO Feng.Research on the combined longitudinal and semi-transverse ventilation system in lengthy highway tunnels[J].China Journal of Highway and Transport,2005,18(3):80-83.
[4]张 旭,徐 琳,韩 星.长大越江公路隧道组合通风设计分析[J].设计参考,2002,38(2):80-83. ZHANG Xu,XU Lin,HAN Xing.Analysis on combined ventilation design for a long cross-river highway tunnel[J].Reference Design,2002,38(2):80-83.
[5]赵超志.单井送排风竖井衬砌滑模施工技术[J].筑路机械与施工机械化,2009,26(11):71-73. ZHAO Chao-zhi.Lining slipform construction technology of sending and exhausting single-shaft[J].Road Machinery & Construction Mechanization,2009,26(11):71-73.
[6]韩 星,张 旭.公路隧道纵向送排式通风竖井数量及其间距研究[J].现代隧道技术,2006,43(3):58-61. HAN Xing,ZHANG Xu.Study on the number and spacing of ventilation shafts in a highway tunnel with longitudinal ventilation [J].Modern Tunnelling Technology,2006,43(3):58-61.
[7]夏永旭,石 平.公路隧道扩(缩)径风道局部损失数值模拟[J].中国公路学报,2006,19(6):83-86. XIA Yong-xu,SHI Ping.Numerical simulation of local loss of expanding or reducing duct in highway tunnel[J].China Journal of Highway and Transport,2006,19(6):83-86.
[8]夏永旭,石 平.公路隧道通风空气交叉污染三维数值分析[J].长安大学学报:自然科学版,2006,26(6):44-47. XIA Yong-xu,SHI Ping.3D numerical analysis on air cross pollution of opening and shaft in ventilation of highway tunnel [J].Journal of Chang'an University:Natural Science Edition,2006,26(6):44-47.
[9]闫治国,杨其新,王明年,等.火灾工况下公路隧道竖井通风模式试验研究[J].土木工程学报,2006,39(11):101-106. YAN Zhi-guo,YANG Qi-xin,WANG Ming-nian,et al.Experimental study of shaft ventilation modes for road tunnels in case of fire [J].China Civil Engineering Journal,2006,39(11):101-106.
[10]郭 春,王明年,周仁强.特长公路隧道全射流通风方式火灾网络计算研究[J].筑路机械与施工机械化,2007,24(11):49-50. GUO Chun,WANG Ming-nian,ZHOU Ren-qiang.Calculation and research of fire net of full jet flow ventilation system for extra-long highway tunnel[J].Road Machinery & Construction Mechanization,2007,24(11):49-50.
[11]梁 园,冯 炼.半横向通风方式下公路隧道火灾数值模拟[J].地下空间与工程学报,2008,4(4):195-198. LIANG Yuan,FENG Lian.Numerical simulation of highway tunnel fire under semi-transverse ventilation[J].Chinese Journal of Underground Space and Engineering,2008,4(4):195-198.
[12]王永东,夏永旭.公路隧道纵向通风数值模拟研究[J].中国公路学报,2002,15(1):82-85. WANG Yong-dong,XIA Yong-xu.Numerical simulation of longitudinal ventilation of highway tunnel[J].China Journal of Highway and Transport,2002,15(1):82-85.
[13]范 磊,曾艳华,设排烟道的隧道中火灾烟气控制效果的模拟研究[J].防灾减灾工程学报,2009,29(2):206-212. FAN Lei,ZENG Yan-hua.Simulation study on smoke control effect of fires in tunnel with smoke extracting gallery[J].Journal of Disaster Prevention and Mitigation Engineering,2009,29(2):206-212.
[14]Juan A,Marcelo R.Prediction of fire and smoke propagation in an underwater tunnel[J].Tunneling and Underground Space Technology,2006(23):90-95.
[15]王明年,杨其新,曾艳华,等.秦岭终南山特长公路隧道网络通风研究[J].公路交通科技,2002,19(4):65-68. WANG Ming-nian,YANG Qi-xin,ZENG Yan-hua,et al.Study on Qinling Zhongnanshan extra-long highway tunnel network ventilation[J].Journal of Highway and Transportation Research and Development,2002,19(4):65-68.
[16]JTJ 026.1—1999,公路隧道通风照明设计规范[S].
[17]徐 挺.相似方法与应用[M].北京:机械工业出版社,1995.
[18]王英敏.矿井通风与安全[M].北京:冶金工业出版社,1979.

Memo

Memo:
-
Last Update: 2011-02-28