[1] JTJ D70—2004,公路隧道设计规范[S].
[2]来弘鹏.软弱围岩公路隧道结构性能试验研究和理论分析[D].西安:长安大学,2007.
[3]李 围.高速公路偏压连拱隧道施工方法数值模拟[J].筑路机械与施工机械化,2008,25(12):73-75.
LI Wei.Numeric simulation for construction method of biased double-arch tunnel of expressway[J].Road Machinery & Construction Mechanization,2008,25(12):73-75.
[4]丁文其,王晓形,朱合华,等.连拱隧道设计荷载的确定方法[J].中国公路学报,2007,20(5):78-82.
DING Wen-qi,WANG Xiao-xing,ZHU He-hua,et al.Defining method for designing load of multi-arch tunnel[J].China Journal of Highway and Transport,2007,20(5):78-82.
[5]王运金.偏压连拱隧道施工顺序优化研究[J].筑路机械与施工机械化,2009,26(2):73-75.
WANG Yun-jin.Research on construction sequence majorization for muti-arch tunnel under bias pressure[J].Road Machinery & Construction Mechanization,2009,26(2):73-75.
[6]陈建勋,李建安.公路隧道二次衬砌厚度的优化[J].交通运输工程学报,2006,6(3):68-72.
CHEN Jian-xun,LI Jian-an.Secondary lining thick-ness optimization of road tunnel[J].Journal of Traffic and Transportation Engineering,2006,6(3):68-72.
[7]周小文,濮家骝.隧洞结构受力及变形特征的离心模型试验研究[J].清华大学学报:自然科学版,2001,41(8):110-112,116.
ZHOU Xiao-wen,PU Jia-liu.Centrifuge model test study of the earth pressure and deformation of tunnel lining[J].Journal of Tsinghua University:Sci&Tech,2001,41(8):110-112,116.
[8]任伟中,朱维申,张玉军,等.开挖条件下节理围岩特性及其锚固效应模型试验研究[J].实验力学,1997,12(4):514-519.
REN Wei-zhong,ZHU Wei-shen,ZHANG Yu-jun,et al.Research on failure behaviour and anchoring effect of jointed rockmasses around an underground opening under excavation by model tesing[J].Journal of Experimental Mechanics,1997,12(4):513-519.
[9]李德寅,王邦楣,林亚超.结构模型实验[M].北京:科学出版社,1996.