[1] JTG TB05—2004,公路项目安全性评价指南[S].
[2]JTG D20—2006,公路路线设计规范[S].
[3]JTG B01—2003,公路工程技术标准[S].
[4]张雨化.道路勘测设计[M].北京:人民交通出版社,1997.
[5]符锌砂.理论运行速度与公路线形设计及评价方法研究[D].西安:长安大学,2008.
[6]杨少伟,石飞荣,潘兵宏,等.可能速度及其在公路线形设计中的应用方法[J].长安大学学报:自然科学版,2004,24(3):1-4
YANG Shao-wei,SHI Fei-rong,PAN Bing-hong,et al.Application of possible velocity in design for highway alignment[J].Journal of Chang'an University:Natural Science Edition,2004,24(3):1-4
[7]符锌砂,高 捷.高速公路纵坡路段货车运行车速预测[J].公路交通科技,2008,25(6):139-143.
FU Xin-sha,GAO Jie.Operating speed predicting model for trucks on freeway's longitudinal slope section[J].Journal of Highway and Transportation Research and Development,2008,25(6):139-143.
[8]余志生.汽车理论[M].北京:机械工业出版社,2000.
[9]郑安文,牛倬民.高等级公路运行速度与设计车速匹配研究[J].武汉科技大学学报:自然科学版,2003,26(3):273-275.
ZHENG An-wen,NIU Zhuo-min.Research on coordination between motorway operation speed and design speed[J].Journal of Wuhan University of Sciencel and Technology:Natural Science Edition,2003,26(3):273-275.
[10]温学钧,杨屹东.高速公路运行速度研究[J].公路交通科技,2002,19(1):80-82.
WEN Xue-jun,YANG Qi-dong.Study on operating speed of vehicles on expressway[J].Journal of Highway and Transportation Research and Development,2002,19(1):80-82.
[11]陈永胜.高速公路安全设计基础理论及关键技术研究[D].北京:北京工业大学,2001.
[12]Kay F,Jon M C.Speed-profile model for two-lane rural highways[J].Joural of the Transportation Research Board,2000,1737(6):42-49.
[13]杨少伟,王海君,张 驰,等.可能速度与交通事故的关系[J].长安大学学报:自然科学版,2009,29(4):34-38
YANG Shao-wei, WANG Hai-jun, ZHANG Chi,et al.Relation between possible speed and traffic accident[J].Journal of Chang'an University:Natural Science Edition,2009,29(4):34-38
[14]陈 涛,魏 朗,袁望方.运行车速认知因子虚拟仿真试验[J].交通运输工程学报,2008,8(2):122-126.
CHEN Tao,WEI Lang,YUAN Wang-fang.Virtual simulation test of perception factors for operating speed[J].Journal of Traffic and Transportation Engineering,2008,8(2):122-126.
[15]徐 进,彭其渊,邵毅明.路线及路面条件设计阶段的安全性评价仿真系统[J].中国公路学报,2007,20(6):36-42.
XU Jin,PENG Qi-yuan,SHAO Yi-ming.Simulation system for safety estimation of alignment and road surface condition in designing phase[J].China Journal of Highway and Transport,2007,20(6):36-42.