|Table of Contents|

Test of shear and pull-off between asphalt and concrete on bridge deck pavement structure(PDF)

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

Issue:
2009年06期
Page:
15-18
Research Field:
Publishing date:
2009-12-20

Info

Title:
Test of shear and pull-off between asphalt and concrete on bridge deck pavement structure
Author(s):
WANG Ya-ling1ZHOU Yu-li2YAO Ai-ling1ZHANG Yi-luo1
1.Key Laboratory for Special Area Highway Engineering of Ministry of Education,Chang’an University,Xi’an 710064,Shaanxi,China;2.Institute of Engineering Design,Chang’an University,Xi’an 710064,Shaanxi,China
Keywords:
road engineering asphalt concrete bridge pavement water proof film shear strength bond strength
PACS:
U443.33
DOI:
-
Abstract:
In order to solve the diseases including spalling, loose and upheaval caused by lacking of shear strength and bond strength of bridge pavement layer, this paper studied the influence of optimum content of different waterproof films, different shear rates and different temperatures on the interlayer shear strength by using MTS810, shear apparatus and pullout apparatus. It also analyzed the bond strength of different water proof films to accurately select water proof film. The results indicated that: SBS modified asphalt and modified asphalt emulsion have a good shear performance; the variety of shear rate has a significant effect on the shear strength of SBS modified asphalt; the high temperature resistance of SBS modified asphalt is the best; the bond strength of modified asphalt emulsion and SBS modified asphalt is fairly high, and they have good extension properties; the relationship between interlayer shear strength and bond strength is a quadratic curve. 4 tabs, 5 figs, 10 refs.

References:

[1]杨军,潘友强,邓学钧.桥面铺装浇注式沥青混凝土性能[J].交通运输工程学报,2007,7(1):4953. YANG Jun,PAN Youqiang,DENG Xuejun.Gussasphalt performances on bridge deck[J].Journal of Traffic and Transportation Engineering,2007,7(1):4953.
[2]斐建中,胡长顺,张占军.桥面防水材料路用性能[J].交通运输工程学报,2001,1(4):3336. PEI Jianzhong,HU Changshun,ZHANG Zhanjun.Road performance of waterproof material for concrete bridge decks [J].Journal of Traffic and Transportation Engineering,2001,1(4):3336.
[3]裴建中,胡长顺,王祥鲁.建筑防水材料用作桥面防水的可行性分析[J].长安大学学报:自然科学版,2002,22(6):2932. PEI Jianzhong,HU Changshun,WANG Xianglu.Application of waterproofing materials for building to concrete bridge decks [J].Journal of Changan University:Nature Science Edition,2002,22(6):2932.
[4]郝培文,胡磊,陈志一,等.大跨径钢箱梁桥面铺装研究与发展[J].筑路机械与施工机械化,2008,25(6):1216. HAO Peiwen,HU Lei,CHEN Zhiyi,et al.Research and development of deck pavement in longspan steel box girder[J].Road Machinery & Construction Mechanization,2008,25(6):1216.
[5]高雪池.桥面排水与防水的研究[D].南京:东南大学,2002.
[6]张占军,胡长顺,王秉纲.水泥混凝土桥面沥青混凝土铺装结构设计方法研究[J].中国公路学报,2001,14(1):5659. ZHANG Zhanjun,HU Changshun,WANG Binggang.Research on the design method of asphalt concrete pavement for concrete bridge deck structure[J].China Journal of Highway and Transport,2001,14(1):5659.
[7]沙庆林.高速公路沥青路面早期破坏现象预防[M].北京:人民交通出版社,2001.
[8]王笑风,胡仁东,张占军,等.混凝土桥面防水层直剪试验[J].长安大学学报:自然科学版,2006,26(4):3034. WANG Xiaofeng,HU Rendong,ZHANG Zhanjun,et al.Shear test on concrete bridge decks with waterproofing layer [J].Journal of Changan University :Nature Science Edition,2006,26 (4):3034.
[9]JTG E30—2005,公路工程水泥及水泥混凝土试验规程[S].
[10]沈春林.路桥防水材料[M].北京:化学工业出版社,2006.

Memo

Memo:
-
Last Update: 2009-12-20