[1]王伯琴,陈录如,陈先峰.高强度螺栓连接[M].北京:冶金工业出版社,1991.
[2]苏彦江.钢桥构造与设计[M].成都:西南交通大学出版社,2006.
[3]郭兆祺,李军平,王岁利,等.芜湖长江大桥钢梁整体节点的制造[J].钢结构,2001,16(1):3133,51.
GUO Zhaoqi,LI Junping,WANG Suili,et al.The fabrication of steel girders with integral joints for Wuhu Yangtze river bridge[J].Steel Construction,2001,16(1):3133,51.
[4]Fisher.Analysis of bolted butt joint[J].Journal of the Structural Division,1978(10):3539.
[5]党志杰.高强度螺栓连接的应力集中系数与传力比[J].桥梁建设,1989(3):6166.
DANG Zhijie.Stress concentration factor and the ratio of force transmission frictional long list of highstrength bolts [J].Bridge Construction,1989(3):6166.
[6]党志杰.摩擦型长列高强度螺栓接头研究[J].桥梁建设,1993(1):5257.
DANG Zhijie.Frictional long list of highstrength bolts connections research[J].Bridge Construction,1993(1):5257.
[7]张晔芝,侯文崎,叶梅新.摩擦型高强度螺栓长接头螺栓传力比研究[J].长沙铁道学院学报,2000,18(4):610.
ZHANG Yezhi,HOU Wenqi,YE Meixin.Study on the forcedelivering ration of high strength bolt friction grip long joint[J].Journal of Changsha Railway Institute,2000,18(4):610.
[8]JGJ 82—91,钢结构高强度螺栓连接的设计、施工及验收规程[S].
[9]GB 50017—2003,钢结构设计规范[S].
[10]TB 10002.2—2005,铁路桥梁钢结构设计规范[S].
[11]王斌华,吕彭民,吴纪生.造桥机主梁高强连接螺栓群的有限元计算[J].长安大学学报:自然科学版,2006,26(1):97100.
WANG Binhua,LU Pengmin,WU Jisheng.Finite element analysis of highstrength bolts for overhead launching gantrys main girder[J].Journal of Changan University:Natural Science Edition,2006,26(1):97100.