|Table of Contents|

Speed prediction model of free-flowing passenger car on long and steep downgrades(PDF)

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

Issue:
2009年04期
Page:
43-47
Research Field:
Publishing date:
2009-08-20

Info

Title:
Speed prediction model of free-flowing passenger car on long and steep downgrades
Author(s):
DENG Yun-chao
Institute of Engineering Design,Chang’an University,Xi’an 710064,Shaanxi,China
Keywords:
road engineering long and steep downgrade operating speed prediction model
PACS:
U412.3
DOI:
-
Abstract:
In order to improve the rationality of the safety facilities set on long and steep downgrades section of highgrade highways, this paper put forward the project to collect the operating speed data of freeflowing passenger car on the long and steep downgrades, analyzed the relationship among operating speed, length and slope of the highway according to statistics principle, built common speed prediction model of freeflowing passenger car on long and steep downgrades of highgrade highways, established multiple regression equation for operating speed prediction model of freeflowing passenger car on a certain long and steep downgrades section of a firstclass highway in Qinghai Province by regression analysis of practical test data. The comparison between the observation speed and prediction speed show that the predictive values and observed values of the car speed on the survey sections are basically same, the operating speed of car on the long and steep downgrades is mainly affected by length and slope, and the operating speed prediction model of freeflowing passenger car on a certain long and steep downgrades can reflect the change law of the speed of the car running on the long and steep downgrades section. 7 tabs, 8 figs, 10 refs.

References:

[1]CastroM,SanchezJA,VaqueroCM.Automated GISbased system for speed estimation and highway safety evaluation[J].Journal of Computing in Civil Engineering,2008,22(5):325331.
[2]Memon R A,Khaskheli G B,Qureshi A S.Operating speed models for twolane rural roads in Pakistan [J].Canadian Journal of Civil Engineering,2008,35(5):443453.
[3]Roads and Traffic Authority.Speed problem definition and countermeasure summary [R].New South Wales:Roads and Traffic Authority,2000.
[4]Park Y J,Saccomanno F F.Evaluating speed consistency between successive elements of a twolane rural highway[J].Transportation Research Part A:Policy and Practice,2006,40(5):375385.
[5]Kim E,Jha M K, Schonfeld P,et al.Highway alignment optimization incorporating bridges and tunnels[J].Journal of Transportation Engineering,2007,133(2):7181.
[6]Easa S M.Establishing highway horizontal alignment to maximize design consistency[J].Canadian Journal of Civil Engineering,2007,34(9):11591168.
[7]Easa S M,Mehmood A.Optimizing design of highway horizontal alignments:new substantive safety approach[J].ComputerAided Civil and Infrastructure Engineering,2008,23(7):560573.
[8]陈涛,魏朗,袁望方.运行车速认知因子虚拟仿真试验[J].交通运输工程学报,2008,8(2):122126. CHEN Tao,WEI Lang,YUAN Wangfang.Virtual simulation test of perception factors for operating speed[J].Journal of Traffic and Transportation Engineering,2008,8(2):122126.
[9]徐进,彭其渊,邵毅明.路线及路面条件设计阶段的安全性评价仿真系统[J].中国公路学报,2007,20(6):3642. XU Jin,PENG Qiyuan,SHAO Yiming.Simulation system for safety estimation of alignment and road surface condition in designing phase[J].China Journal of Highway and Transport,2007,20(6):3642.
[10]吴德华,王选仓,季求知,等.陕西公路平纵线形指标[J].长安大学学报:自然科学版,2005,25(2):4649,81. WU Dehua,WANG Xuancang,JI Qiuzhi,et al.Plat and profile linear index of Shaanxi road[J].Journal of Changan University:Natural Science Edition,2005,25(2):4649,81.

Memo

Memo:
-
Last Update: 2009-08-20