[1]JTJ 059—95,公路路基路面现场测试规程[S].
[2]JTJ 033—95,公路路基施工技术规范[S].
[3]李冰,焦生杰.振动压路机与振动压实技术[M].北京:人民交通出版社,2001.
[4]毛洪录,曹卫东,商庆森,等.含砂低液限粘土路基压实标准的探讨[J].山东大学学报:工学版,2003,33(5):593596.
MAO Honglu,CAO Weidong,SHANG Qingsen,et al.Study on compaction standard of subgrade with bearing sand silt of low liquid limit[J].Journal of Shandong University:Technology Edition,2003,33(5):593596.
[5]谭昌明,徐日庆,周建,等.软粘土路基沉降的一维固结反演与预测[J].中国公路学报,2002,15(4):1416.
TAN Changming,XU Riqing,ZHOU Jian,et al.Settlement backanalysis and prediction for soft clay ground of embankment[J].China Journal of Highway and Transport,2002,15(4):1416.
[6]吴立坚,钟发林,吴昌兴,等.高液限土路基填筑技术研究[J].中国公路学报,2003,16(1):3235.
WU Lijian,ZHONG Falin,WU Changxing,et al.Study of subgrade construction from high liquid limit soil[J].China Journal of Highway and Transport,2003,16(1):3235.
[7]张红春,戴经梁,李小重,等.智能冲击压路机路基压实度自动检测方法[J].交通运输工程学报,2007,7(5):6367.
ZHANG Hongchun,DAI Jingliang,LI Xiaozhong,et al.Compactness automatic detecting method of subgrade for intelligent impact roller[J].Journal of Traffic and Transportation Engineering,2007,7(5):6367.
[8]吴超凡,申爱琴,王秉纲.半刚性基层材料的碾压机械优化组合[J].长安大学学报:自然科学版,2007,27(1):1114.
WU Chaofan,SHEN Aiqin,WANG Binggang.Optimal combination of compacting machineries on semirigid base material[J].Journal of Changan University:Natural Science Edition,2007,27(1):1114.