|Table of Contents|

Control of Concrete Craking at Early Time for Bridge Overlay(PDF)

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

Issue:
2006年03期
Page:
21-25
Research Field:
Publishing date:
2006-06-20

Info

Title:
Control of Concrete Craking at Early Time for Bridge Overlay
Author(s):
WANG Dong-yang1CHEN Shu-xian2
1.Key Laboratory for Special Area Highway Engineering of Ministry of Education,Chang’an University,Xi’an 710064,Shaanxi,China;2.Department of Architecture and Civil Engineering,Jilin Communications College of Profession Technique,Changchun 130012,Jilin,China
Keywords:
-
PACS:
U443.33
DOI:
-
Abstract:
-

References:

-

Memo

Memo:
-
Last Update: 2006-06-20