|Table of Contents|

Control technique for construction of pre-stressed-concrete cantilever casting bridge(PDF)

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

Issue:
2005年06期
Page:
43-48
Research Field:
Publishing date:
2005-12-20

Info

Title:
Control technique for construction of pre-stressed-concrete cantilever casting bridge
Author(s):
ZHOU Mi12SONG Yi-fan1ZHAO Xiao-xing1
1.Key Laboratory for Bridge and Tunnel of Shaanxi Province,Chang’an University,Xi’an 710064,China;2.State Key Laboratory for Disaster Reduction in Civil Engineering,Tongji University,Shanghai 200092,China
Keywords:
-
PACS:
U445.57
DOI:
-
Abstract:
-

References:

-

Memo

Memo:
-
Last Update: 2005-12-20