[1]易汉斌,李传习,吴后选,等.既有预应力宽幅空心板受力性能的破坏性试验[J].长安大学学报(自然科学版),2018,38(04):64-70.
 YI Han bin,LI Chuan xi,WU Hou xuan,et al.Destructive test on mechanical behavior of existingprestressed wide hollow slabs[J].Journal of Chang’an University (Natural Science Edition),2018,38(04):64-70.
点击复制

既有预应力宽幅空心板受力性能的破坏性试验()
分享到:

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

卷:
第38卷
期数:
2018年04期
页码:
64-70
栏目:
桥梁与隧道工程
出版日期:
2018-07-31

文章信息/Info

Title:
Destructive test on mechanical behavior of existingprestressed wide hollow slabs
作者:
易汉斌李传习吴后选江祥林
(1. 长沙理工大学 土木工程学院,湖南 长沙 410076; 2. 江西赣粤高速公路股份有限公司,江西 南昌 330025; 3. 江西省交通科学研究院,江西 南昌 330200)
Author(s):
YI Hanbin LI Chuanxi WU Houxuan JIANG Xianglin
(1. School of Civil Engineering, Changsha University of Science and Technology, Changsha 410076, Hunan,China; 2. Jiangxi Ganyue Expressway CO. LTD, Nanchang 330025, Jiangxi, China;3. Jiangxi Transportation Institute, Nanchang 330200, Jiangxi, China)
关键词:
桥梁工程空心板破坏性试验极限承载力非线性有限元分析
Keywords:
bridge engineering hollow slab destructive test ultimate bearing capacity nonlinear finite element analysis
文献标志码:
A
摘要:
为了准确评估宽幅空心板构件的承载能力,以昌樟(南昌—樟树)高速公路改扩建工程为依托,对肖江大桥拆除的2片服役20年的预应力混凝土宽幅空心板进行原型试验研究。试验采用2个1 500 kN千斤顶,对空心板进行分级加载直至试件破坏,分析构件的破坏模式及加载过程中挠度、应变随荷载变化的关系;基于退化分层壳元法编程考虑材料、几何非线性的有限元分析程序,并应用该程序对试验全过程进行数值模拟。结果表明:构件破坏模式为顶板混凝土压碎,跨中截面形成塑性铰的典型受弯结构破坏;加载至构件开裂时,1号、2号梁的开裂荷载分别为360、320 kN,对应的实测挠度值分别为22、16 mm,加载至破坏时,1号、2号梁对应的破坏荷载分别为880、800 kN,对应的实测挠度值分别为556、540 mm,构件具有较好的延性性能;数值模拟计算的开裂荷载和破坏荷载分别为360、920 kN,为1号梁试验值的1.00、1.05倍,为2号梁试验值的1.13、1.15倍,数值模拟计算值与试验结果吻合较好,编程的有限元程序能较好地模拟预应力钢筋混凝土空心板的破坏全过程;由试验结果及理论计算得出,1号、2号梁的活载因子λ分别为3.16、2.77,安全系数Sf分别为1.57、1.43,构件具有较好的承载力性能。
Abstract:
In order to accurately evaluate the bearing capacity performance of wide hollow slab, based on Changzhang Highway reconstruction and expansion project, a prototype test of two prestressed concrete wide hollow slabs in service for 20 years has been carried out with the opportunity of demolition and reconstruction of Xiaojiang Bridge. In this experiment, two 1 500 kN jacks were used to load the hollow slabs until the specimens were damaged, the failure modes of the components and the relationship between the deflections and strains during the loading process were analyzed. Based on the degradation of layered shell element method, a finite element analysis program considering the consideration of material and geometric nonlinearity was compiled, and the program was used to simulate the whole process of the test. The results show that the failure mode of the component is crushed by the roof concrete, and the typical bending structure of the middle cross section is formed by the plastic hinge,the cracking load of No.1 and No.2 beam is 360 and 320 kN, the corresponding deflection is 22 and 16 mm respectively. While loading to failure, the failure load of No.1 and No.2 is 880 and 800 kN, the corresponding deflection is 556 and 540 mm respectively, which shows that the component has better ductility. The cracking and failure loads calculated by the numerical simulation are 360 and 920 kN, which is 1.00 and 1.05 times as much as that of the test value of No.1, 1.13 and 1.15 times as much as that of the test value of No.2. The numerical simulation results are in good agreement with the experimental results, which shows that the nonlinear finite element program developed by the authors can simulate the whole failure process of the prestressed reinforced concrete flexural members well, according to the test results and theoretical calculations, the live load factors of No.1 and No.2 beams are 3.16 and 2.77, and the safety factors are 1.57 and 1.43 respectively, indicating that the component has good bearing capacity. 2 tabs, 11 figs, 23 refs.

相似文献/References:

[1]李宇,朱晞,杨庆山,等.高墩大跨桥梁结构的脆弱性分析[J].长安大学学报(自然科学版),2012,32(01):0.
[2]高亮,刘健新,张丹,等.桁架桥主梁三分力系数试验[J].长安大学学报(自然科学版),2012,32(01):0.
[3]刘旭政,王丰平,黄平明,等.斜拉桥各构件校验系数的常值范围[J].长安大学学报(自然科学版),2012,32(01):0.
[4]尚维波,张春宁.高墩刚构桥系梁抗震分析[J].长安大学学报(自然科学版),2012,32(01):0.
[5]邬晓光,李冀弘,宋伟伟.基于改进响应面法的在役PC桥梁承载力可靠性[J].长安大学学报(自然科学版),2012,32(03):53.
 WU Xiao-guang,LI Ji-hong,SONG Wei-wei.Reliability of existing PC bridge based on improved response surface method[J].Journal of Chang’an University (Natural Science Edition),2012,32(04):53.
[6]石雄伟,袁卓亚,马毓泉,等.钢板-混凝土组合加固预应力混凝土箱梁[J].长安大学学报(自然科学版),2012,32(03):58.
 SHI Xiong-wei,YUAN Zhuo-ya,MA Yu-quan,et al.Prestressed concrete box girder strengthened with comsposition of steel plate and concrete[J].Journal of Chang’an University (Natural Science Edition),2012,32(04):58.
[7]李传习,陶 伟,董创文.斜交墩截面刚度与弯曲正应力[J].长安大学学报(自然科学版),2012,32(03):63.
 LI Chuan-xi,TAO Wei,DONG Chuang-wen.Sectional stiffness and bending normal stress of oblique pier[J].Journal of Chang’an University (Natural Science Edition),2012,32(04):63.
[8]邓继华,邵旭东.带铰平面梁元几何非线性有限元分析[J].长安大学学报(自然科学版),2012,32(03):68.
 DENG Ji-hua,SHAO Xu-dong.Geometric nonlinear finite element analysis of plane beam element with hinge[J].Journal of Chang’an University (Natural Science Edition),2012,32(04):68.
[9]蒲广宁,赵 煜,宋一凡.减梁增肋法加固空心板桥的力学性能[J].长安大学学报(自然科学版),2012,32(06):38.
 PU Guang-ning,ZHAO Yu,SONG Yi-fan.Mechanical properties of strengthening hollow slab bridge based on beam-reduction and rib-addition method[J].Journal of Chang’an University (Natural Science Edition),2012,32(04):38.
[10]党 栋,贺拴海,周勇军,等.基于车辆统计数据的汽车荷载标准值取值与评估[J].长安大学学报(自然科学版),2012,32(06):44.
 DANG Dong,HE Shuan-hai,ZHOU Yong-jun,et al.Choosing and assessment for the standard of vehicle load based on vehicle statistical data[J].Journal of Chang’an University (Natural Science Edition),2012,32(04):44.
[11]易汉斌,俞 博.装配式混凝土空心板铰缝横向弯矩计算[J].长安大学学报(自然科学版),2019,39(05):88.
 YI Han bin,YU Bo.Calculation of transverse bending moments of shear key of assembled concrete hollow slabs[J].Journal of Chang’an University (Natural Science Edition),2019,39(04):88.

更新日期/Last Update: 2018-08-03