相似文献/References:
[1]李宇,朱晞,杨庆山,等.高墩大跨桥梁结构的脆弱性分析[J].长安大学学报(自然科学版),2012,32(01):0.
[2]高亮,刘健新,张丹,等.桁架桥主梁三分力系数试验[J].长安大学学报(自然科学版),2012,32(01):0.
[3]尚维波,张春宁.高墩刚构桥系梁抗震分析[J].长安大学学报(自然科学版),2012,32(01):0.
[4]邬晓光,李冀弘,宋伟伟.基于改进响应面法的在役PC桥梁承载力可靠性[J].长安大学学报(自然科学版),2012,32(03):53.
WU Xiao-guang,LI Ji-hong,SONG Wei-wei.Reliability of existing PC bridge based on improved response surface method[J].Journal of Chang’an University (Natural Science Edition),2012,32(06):53.
[5]石雄伟,袁卓亚,马毓泉,等.钢板-混凝土组合加固预应力混凝土箱梁[J].长安大学学报(自然科学版),2012,32(03):58.
SHI Xiong-wei,YUAN Zhuo-ya,MA Yu-quan,et al.Prestressed concrete box girder strengthened with comsposition of steel plate and concrete[J].Journal of Chang’an University (Natural Science Edition),2012,32(06):58.
[6]李传习,陶 伟,董创文.斜交墩截面刚度与弯曲正应力[J].长安大学学报(自然科学版),2012,32(03):63.
LI Chuan-xi,TAO Wei,DONG Chuang-wen.Sectional stiffness and bending normal stress of oblique pier[J].Journal of Chang’an University (Natural Science Edition),2012,32(06):63.
[7]邓继华,邵旭东.带铰平面梁元几何非线性有限元分析[J].长安大学学报(自然科学版),2012,32(03):68.
DENG Ji-hua,SHAO Xu-dong.Geometric nonlinear finite element analysis of plane beam element with hinge[J].Journal of Chang’an University (Natural Science Edition),2012,32(06):68.
[8]蒲广宁,赵 煜,宋一凡.减梁增肋法加固空心板桥的力学性能[J].长安大学学报(自然科学版),2012,32(06):38.
PU Guang-ning,ZHAO Yu,SONG Yi-fan.Mechanical properties of strengthening hollow slab bridge
based on beam-reduction and rib-addition method[J].Journal of Chang’an University (Natural Science Edition),2012,32(06):38.
[9]党 栋,贺拴海,周勇军,等.基于车辆统计数据的汽车荷载标准值取值与评估[J].长安大学学报(自然科学版),2012,32(06):44.
DANG Dong,HE Shuan-hai,ZHOU Yong-jun,et al.Choosing and assessment for the standard of vehicle
load based on vehicle statistical data[J].Journal of Chang’an University (Natural Science Edition),2012,32(06):44.
[10]段 兰,张 亮,王春生,等.高强度工字钢梁抗弯性能试验[J].长安大学学报(自然科学版),2012,32(06):52.
DUAN Lan,ZHANG Liang,WANG Chun-sheng,et al.Flexural behavior test of high strength steel I beam[J].Journal of Chang’an University (Natural Science Edition),2012,32(06):52.
[11]刘旭政,王丰平,黄平明,等.斜拉桥各构件校验系数的常值范围[J].长安大学学报(自然科学版),2012,32(01):0.
[12]孙胜江,姜智英,高剑,等.正装优化法确定斜拉桥合理施工状态[J].长安大学学报(自然科学版),2008,28(05):63.
SUN Sheng-jiang,JIANG Zhi-ying,GAO Jian,et al.Forward-calculating optimization method for determining rational construction state of cable-stayed bridges[J].Journal of Chang’an University (Natural Science Edition),2008,28(06):63.
[13]张永健,黄平明,贺志高,等.Π形梁斜拉桥主梁剪力滞特性试验[J].长安大学学报(自然科学版),2008,28(06):51.
ZHANG Yong-jian,HUANG Ping-ming,HE Zhi-gao.Test on shear lag of cable-stayed bridge with П-shaped cross section main girder[J].Journal of Chang’an University (Natural Science Edition),2008,28(06):51.
[14]周绪红,吕忠达,狄谨,等.钢箱梁斜拉桥索梁锚固区极限承载力分析[J].长安大学学报(自然科学版),2007,27(03):47.
ZHOU Xu-hong,L Zhong-da,DI Jin,et al.Analysis of ultimate bearing capacity on cable-girder anchorage zone of cable-stayed bridge with steel box girder[J].Journal of Chang’an University (Natural Science Edition),2007,27(06):47.
[15]孔祥福,周绪红,狄谨,等.钢箱梁斜拉桥正交异性桥面板的受力性能[J].长安大学学报(自然科学版),2007,27(03):52.
KONG Xiang-fu,ZHOU Xu-hong,DI Jin,et al.Orthotropic deck performance of steel box girder cable-stayed bridge[J].Journal of Chang’an University (Natural Science Edition),2007,27(06):52.
[16]梅葵花,吕志涛,张继文,等.碳纤维复合材料索斜拉桥的设计与测试[J].长安大学学报(自然科学版),2007,27(06):48.
MEI Kui-hua,Lü Zhi-tao,ZHANG Ji-wen,et al.Study on the design and test of the cable-stayed bridge with CFRP cables[J].Journal of Chang’an University (Natural Science Edition),2007,27(06):48.
[17]刘旭政,王达,许汉铮.基于线性回归的桥梁结构反应预测分析基于线性回归的桥梁结构反应预测分析[J].长安大学学报(自然科学版),2009,29(05):76.
LIU Xu zheng,WANG Da,XU Han zheng.Prediction analysis of bridge structural response
based on linear regression[J].Journal of Chang’an University (Natural Science Edition),2009,29(06):76.
[18]梁鹏,肖汝诚,徐岳,等.超大跨度斜拉桥的安装构形与无应力构形[J].长安大学学报(自然科学版),2006,26(04):49.
LIANG Peng,XIAO Ru-cheng,XU Yue.Assembled geometry and unstrained geometry of super long span cable-stayed bridges[J].Journal of Chang’an University (Natural Science Edition),2006,26(06):49.
[19]刘荣桂,郭 青,陈 蓓,等.几何非线性效应下的CFRP索斜拉桥动力特性[J].长安大学学报(自然科学版),2014,34(02):59.
[J].Journal of Chang’an University (Natural Science Edition),2014,34(06):59.
[20]袁 鹏,李德建,陆 尧,等.四索面钢箱梁斜拉桥合理施工状态确定方法[J].长安大学学报(自然科学版),2017,37(05):49.
YUAN Peng,LI De-jian,LU Yao,et al.Determination method of reasonable construction state of steel box girder cable-stayed bridge with four cable planes[J].Journal of Chang’an University (Natural Science Edition),2017,37(06):49.