[1]胡长明,张延杰,袁一力,等.盾构隧道临近河流始发及过电塔掘进技术[J].长安大学学报(自然科学版),2017,37(06):83-91.
 HU Chang-ming,ZHANG Yan-jie,YUAN Yi-li,et al.Excavation technique of shield launching crossing adjacent river and under-passing voltage tower[J].Journal of Chang’an University (Natural Science Edition),2017,37(06):83-91.
点击复制

盾构隧道临近河流始发及过电塔掘进技术()
分享到:

长安大学学报(自然科学版)[ISSN:1006-6977/CN:61-1281/TN]

卷:
第37卷
期数:
2017年06期
页码:
83-91
栏目:
桥梁与隧道工程
出版日期:
2017-11-20

文章信息/Info

Title:
Excavation technique of shield launching crossing adjacent river and under-passing voltage tower
文章编号:
1671-8879(2017)06-0083-09
作者:
胡长明张延杰袁一力梅 源张文萃
西安建筑科技大学 土木工程学院,陕西 西安 710055
Author(s):
HU Chang-ming ZHANG Yan-jie YUAN Yi-li MEI Yuan ZHANG Wen-cui
School of Civil Engineering, Xi’an University of Architecture and Technology, Xi’an 710055, Shaanxi, China
关键词:
隧道工程盾构施工数值模拟砂卵石地层风险管理
Keywords:
tunnel engineering shield construction numerical simulation sand gravel stratum risk management
分类号:
U455.43
文献标志码:
A
摘要:
为研究多因素状态下,不同类型的风险源相邻时在盾构开挖施工中的相互影响,解决相邻风险源工况下的盾构始发风险问题,以成都地铁3号线盾构隧道工程为背景,总结已穿越地段的沉降数据,分析不同类型的施工风险并确定风险响应措施。采用三维数值方法模拟地铁盾构穿越高压电塔掘进施工工况,通过改变前方开挖土体的性质来模拟渣土改良的过程和地面加固措施,通过改变材料属性来模拟注浆材料强度随时间的变化过程,分析渣土改良、洞内注浆和地面注浆措施对盾构隧道穿越建筑物的影响,并进行数值计算假设的可行性和参数取值的合理性验证。研究结果表明:在盾构始发前需进行地面降水、河流防水铺砌与河堤加固等措施,在盾构始发后至下穿河流掘进前需进行洞门密封、渣土改良和土仓置换等措施,在穿越河流后应及时进行电塔的洞内注浆、地面加固和掘进参数的优化调整等措施,一系列针对相邻风险源施工的辅助措施,证明了该盾构掘进技术成果的可行性;在下穿建筑物施工时应关注已开挖环处的地表沉降,并加强管片脱出盾尾时所在断面的地表沉降趋势的监控;在渣土改良和有效优化掘进参数的基础上,采用洞内施工措施和地面加固均可有效控制地层沉降,但洞内注浆等措施优于地面加固效果。提出的盾构临近河流始发及下穿电塔建筑物的施工措施和综合掘进技术,可为多风险源下临近的盾构施工提供理论依据和指导措施。
Abstract:
In order to study the interaction between different kind of adjacent risk sources under multi-factors, and solve the risk problem of shield launching under the condition of adjacent risk sources, on the basis of the shield tunneling of Chengdu Metro Line 3, settlement data of the excavated section were summarized. Different types of construction risk were analyzed and the risk response measures were also determined. Moreover, a three-dimensional numerical simulation of the metro shield tunneling construction was conducted, in which the soil improvement and ground reinforcement were simulated by changing the property of soil in front of the TBM, and the variation of the strength of grouting material along with time was simulated by changing the material properties. Influence of soil improvement, grouting in tunnel, and ground grouting on shield tunneling crossing constructions was analyzed. Calculation result verified the feasibility of the numerical calculation hypothesis and the rationality of the selected parameters. A series of auxiliary measures for the construction of adjacent risk sources proved the feasibility of the shield tunneling technological achievements. The specific measures included surface precipitation, waterproof paving of river and embankment reinforcement before shield launching, hole sealing, soil improvement and soil replacement of warehouse before crossing the river and after shield launching, the underground grouting of electric tower, ground reinforcement and optimization of tunneling parameters after crossing the river. The results show that attention should be paid to ground settlement of the excavated rings in the construction of shield tunneling under buildings and the monitoring of the trend of ground settlement in the section where the segments are coming off the shield tail should be enhanced. Based on the soil improvement and effective excavation parameters, underground construction measures and ground reinforcement both can effectively control the ground settlement, while the underground grouting and other measures have better effect than the ground reinforcement. It can provide the theoretical basis and guidance for the construction of shield near the multi-hazard sources like crossing adjacent river and under-passing voltage tower by construction measures and comprehensive excavation technology of the research.

相似文献/References:

[1]罗 刚,石研玉,申 奇,等.水中悬浮隧道锚索横向动力特性分析[J].长安大学学报(自然科学版),2012,32(03):73.
 LUO Gang,SHI Yan-yu,SHENG Qi,et al.Lateral dynamic characteristics analysis for cable of submerged floating tunnel in water[J].Journal of Chang’an University (Natural Science Edition),2012,32(06):73.
[2]易富君,韩 直,邓 卫.公路隧道群运营安全性综合评价方法[J].长安大学学报(自然科学版),2012,32(03):79.
 YI Fu-jun,HAN Zhi,DENG Wei.Comprehensive safety evaluation method of expressway tunnel group[J].Journal of Chang’an University (Natural Science Edition),2012,32(06):79.
[3]王 磊,郭洋洋.特长公路隧道运营网络通风技术[J].长安大学学报(自然科学版),2012,32(04):51.
 WANG Lei,GUO Yang-yang.Network ventilation technology of operation period in super long highway tunnel[J].Journal of Chang’an University (Natural Science Edition),2012,32(06):51.
[4]韩日美,宋战平,谢永利,等.土压平衡盾构土仓压力对地表沉降的影响[J].长安大学学报(自然科学版),2010,30(01):59.
 HAN Ri-mei,SONG Zhan-ping,XIE Yong-li,et al.Affection of soil warehouses pressure of EPB shield on ground settlement[J].Journal of Chang’an University (Natural Science Edition),2010,30(06):59.
[5]朱正国,陈明长,孙明磊.双连拱公路隧道围岩压力计算方法[J].长安大学学报(自然科学版),2010,30(02):75.
 ZHU Zheng-guo,CHEN Ming-zhang,SUN Ming-lei.Calculation method of pressure of surrounding rock on double-arch road tunnel[J].Journal of Chang’an University (Natural Science Edition),2010,30(06):75.
[6]刘 辉,李 波,吴从师,等.岩溶隧道掘进爆破震动效应分析[J].长安大学学报(自然科学版),2010,30(04):56.
 LIU Hui,LI Bo,WU Cong-shi,et al.Analysis on effects of vibration resulted from driving blasting in Karst tunnel[J].Journal of Chang’an University (Natural Science Edition),2010,30(06):56.
[7]朱春生,杨晓华,来弘鹏,等.公路隧道衬砌后空洞对结构安全的影响[J].长安大学学报(自然科学版),2010,30(05):63.
 ZHU Chun-sheng,YANG Xiao-hua,LAI Hong-peng,et al.Impact of empty hole behind expressway tunnel lining on structure safety[J].Journal of Chang’an University (Natural Science Edition),2010,30(06):63.
[8]来弘鹏,谢永利,杨晓华.不同应力场软弱围岩公路连拱隧道中墙受力特征[J].长安大学学报(自然科学版),2010,30(06):50.
 LAI Hong-peng,XIE Yong-li,YANG Xiao-hua.Stress characteristics of middle wall in soft-wreak surrounding rocks highway multiple-arch tunnel under different stress field[J].Journal of Chang’an University (Natural Science Edition),2010,30(06):50.
[9]来弘鹏,谢永利,杨晓华,等.不同应力场软弱围岩公路连拱隧道力学特征试验[J].长安大学学报(自然科学版),2008,28(06):60.
 LAI Hong-peng,XIE Yong-li,YANG Xiao-hua.Model tests for soft-weak surrounding rocks highway multiple-arch tunnel stress characteristics in different stress fields[J].Journal of Chang’an University (Natural Science Edition),2008,28(06):60.
[10]郭建新,高永涛.基于围岩破坏区和承载力的锚杆支护设计[J].长安大学学报(自然科学版),2008,28(06):65.
 GUO Jian-xin,GAO Yong-tao.Design of anchor bolt support based on analysis of surround rock damage area and bear force[J].Journal of Chang’an University (Natural Science Edition),2008,28(06):65.

备注/Memo

备注/Memo:
收稿日期:2017-03-13 基金项目:国家自然科学基金项目(51408463);陕西省教育厅专项科研计划项目(15JK1413);西安建筑科技大学科技项目(QN1409,RC1375)作者简介:胡长明(1963-),男,河南信阳人,教授,博士研究生导师,E-mail:hu.tm@163.com。
更新日期/Last Update: 2017-12-18